Laserfiche WebLink
<br />L- <br /> <br />L- <br /> <br />-- <br /> <br />.L <br /> <br />.2!:1 <br /> <br />'-'---'- ~ <br />L--. <br /> <br />---1 <br /> <br />development of regional regression relationships os well as woter surface <br />profile determination for gradually varied flow. <br /> <br />8. Loves Pork Flood Control Project involving detailed urban hydrologic, <br />hydraulic, and urban flood damage economic analysis. <br /> <br />C. <br /> <br />Shiawassee Flats Flood Control Project involving open channel hydraulic <br />analysis to determine levee height and the evaluation of agricultural <br />damages due to flooding. <br /> <br /><=> <br />c::.> <br />~.... <br />..."- <br />[.,,;) <br />= <br /> <br />D. <br /> <br />Numerous Landfill Projects requiring subsurface drainage analysis by <br />consideration of saturated and unsaturated porous media flow, <br /> <br />E. Dam Inspection in Wisconsin and Michigan requiring hydraulic and hydrologic <br />analysis of existing dams. Hydraulic analysis iocluded evaluation of spill <br />way adequacy and hydrologic analysis included development of frequency - <br />discharge relationships .as well os hypothetical flood events such os the <br />Standard Project Flood and Probable Maximum Flood. <br /> <br />F. Hydraulic Design of numerous bridges and culverts requiring analysis of <br />scour potential, debris blockage potential, and backwater. <br /> <br />ADD IT IONAL <br />TRAINING: <br /> <br />Review of Civil Engineering Refresher Course - 16 Hours, 1974 Stormwater <br />Detention Basin Design Seminar - 24 Hours, 1975 Programmable Calculators in <br />Water Resources Engineering Seminar - 24 Hours, 1977. Computer Workshop in <br />Statistical Hydrology - 40 Hours, ~uly 1978. Course in Life Cycle Costing - <br />16 Hours, March-April 1980. <br /> <br />I <br /> <br />A <br />~~ <br />OWEN AYRES A A!l\:~{)r.fATF'~ IN(: <br />