My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01221
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC01221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:10:14 AM
Creation date
10/9/2006 2:38:09 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.P
Description
Colorado River Water Projects - Animas La Plata - Other General Subjects
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/1/1995
Author
DOE
Title
ALP-Durango Colorado Final Completion Report - Volume I - Sections I and IV
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- .' OD27,)3 <br /> <br />IV. SECTION IV - CERTIFICATION BASIS <br />CERTIFICATION BASIS: <br />The MK-Ferguson Company hereby certifies that remedial actions are <br />completed at the Durango, Colorado Uranium Mill Tailings Site in <br />accordance with the requirements of: <br /> <br />o UMTRA-DOE/AL 050503.0000 "Remedial Action Plan and Site Design for <br />Stabilization of the Inactive Uranium Mill ,Tailings Site at Durango, <br />Colorado," dated November, 1990. <br /> <br />o Contract No. DE-AC04-83ALl8796, Remedi a 1 Act i on Contract for the <br />Uranium Mill Tailings Remedial Action Project; <br /> <br />o Approved drawings and specifications for remedial action activities <br /> <br /> <br />at the Durango, Colorado Uranium Mill Tailings Site, prepared for <br /> <br /> <br />the Department of Energy by MK-Ferguson Company and MK-Environmental <br /> <br /> <br />Services, Inc. <br /> <br />Section II of this completion report demonstrates that the design was prepared <br /> <br /> <br />in accordance with the approved design criteria and Remedial Action Plan for <br /> <br /> <br />Durango, Colorado. Sect i on I II demonstrates that work was completed and <br /> <br /> <br />inspected to verify that it meets the requirements of the design. Based on the <br /> <br /> <br />cons i stency and cont i nui ty between des i gn requi rements, detailed desi gn, and <br /> <br /> <br />completion of remedial action activities, MK-Ferguson recommends the Department <br /> <br /> <br />of Energy certify the Durango, Colorado remedial action as being completed in <br /> <br /> <br />accordance with the established agreements and EPA standards. <br /> <br />1050H <br />
The URL can be used to link to this page
Your browser does not support the video tag.