My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00985
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC00985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:08:35 AM
Creation date
10/9/2006 2:29:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.100
Description
Colorado River Computer Models - Colorado River Simulation System - Reclamation - CORSIM
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/1/1985
Author
DOI-BOR
Title
CRSS - Colorado River Simulation System - System Overview
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00158'.) <br /> <br />INFLOW 1100 AF (acre-feet) <br /> <br />FLOW <br />1100 AF <br /> <br />1000 AF <br /> <br />700 AF . <br /> <br />800 AF <br /> <br />1300 AF <br /> <br />1100 AF <br /> <br />2 <br /> <br />100 AF <br /> <br />3 <br /> <br />300 AF <br /> <br />4 <br /> <br />100 AF <br /> <br />5 <br /> <br />500 AF <br /> <br />EXPORT <br /> <br />DIVERSION <br /> <br />RETURN FLOW <br /> <br />INFLOW <br /> <br />6 <br /> <br />200 AF DIVERSION <br /> <br />TARGET CONTENTS = 2600 AF <br />. CURR EN; CONTE NTS = 2000 AF <br />MIN. RELEAS E = 100 AF <br />MAX RELEASE = 1000 AF <br />MIN. CAPACITY = 0 AF <br />MAX. CAPACITY= 3000 AF <br /> <br /> <br />400 AF <br /> <br />OAF <br /> <br />200 AF <br /> <br />7 <br /> <br />8 <br /> <br />500 AF <br /> <br />9 <br /> <br />200 AF <br /> <br />OUTF LOW 200 AF <br /> <br />ASSUME A BANK STORAGE=60 AF <br />ASSUME EVAPORATION ~ 40 AF <br /> <br />CONTENTS = 2000 + 1100 - 60 - 40 = 3000 A F <br /> <br />RELEASE = 3000- 2600 AF = 400 AF <br />END OF MONTH CONTENTS= 3000-400=2600 AF <br />CONSTRAINTS ARE O.K. <br /> <br />DIVERSION <br />NEED 100 AF M ORE TO MEET 01 VERSION <br />CALL ON RESERVOIR TO SUPPLY <br />ADDITIONAL WATER <br />NEW RESERVOIR RELEASE = 500 AF <br />NEW E. O. M CONTE NTS = 2500 AF <br />CONSTRAINTS ARE O.K. <br />RETURN FLOW <br /> <br />Figure 7.2 - Example of Water Routing <br />
The URL can be used to link to this page
Your browser does not support the video tag.