My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00985
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC00985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:08:35 AM
Creation date
10/9/2006 2:29:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.100
Description
Colorado River Computer Models - Colorado River Simulation System - Reclamation - CORSIM
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/1/1985
Author
DOI-BOR
Title
CRSS - Colorado River Simulation System - System Overview
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r"~J 1 ")' 3 !. <br />U \. .L \. ~ <br /> <br />2. Management of CRSS <br /> <br />2.1 Organizational Chart <br /> <br />The CRSS is technically supported by a technical management team and <br />administratively guided by a steering committee. The two groups are <br />made up of personnel from the Upper Colorado Regional Office, Lower <br />Colorado Regional Office, Engineering and Research Center, and <br />Washington Office. <br /> <br />The technical management team has the responsibilities of (1) main- <br />taining technical adequacy of the model, data bases, and documentation; <br />(2) carrying out development work on the model; and (3) performing <br />studies using the model. The team consists of personnel from the fields <br />of operations, hydrology, water quality, and environment. The two <br />regional offices and the E&R Center each provide a CRSS coordinator to <br />coordinate activities in their respective offices. In addition, the E&R <br />Center provides an executive secretary to the steering committee who is <br />the liaison between the technical management team and steering commit- <br />tee. The executive secretary coordinates activities between the CRSS <br />coordinators and plans steering committee meetings. The technical <br />management team meets several times a year as needed. <br /> <br />The steering committee has the responsibility of reviewing the accom- <br />plishments of the technical management team, approving work schedules <br />for the team, approving changes to the model which affect policy, and <br />setting policy and guidelines. The steering committee consists of an <br />Assistant Regional Director from the Upper Colorado and Lower Colorado <br />Regional Offices; the Assistant Commissioner - Planning and Operations <br />from the Washington Office; and from the E&R Center, the Chief, Colorado <br />River Water Quality Office; Chief, Division of Water and Land Technical <br />Services; and Chief, Division of Planning Technical Services. The <br />steering committee meets once every 6 months. <br /> <br />An organizational chart is shown in figure 2.1. <br /> <br />2.2 Persons to Contact <br /> <br />For additional information or assistance involving CRSS, contact one of <br />the following offices: <br /> <br />Regional Oirector <br />Bureau of Reclamation <br />Upper Colorado Region <br />Attention: UC-415 (CRSS) <br />P.O. Box 11568 <br />Salt Lake City, utah 84147 <br /> <br />Telephone (CRSS coordinator): <br />801-524-5872 or FTS 588-5872 <br /> <br />Regional Director <br />Bureau of Reclamation <br />Lower Colorado Region <br />Attention: LC-754 (CRSS) <br />P.O. Box 427 <br />Boulder City, Nevada 89005 <br /> <br />Telephone (CRSS coordinator): <br />"702-293-8568 or FTS 598-7568 <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.