My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00881
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC00881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:07:55 AM
Creation date
10/9/2006 2:24:03 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272
Description
Colorado River - Colorado River Basin Salinity Control Program - CRBSCP
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/1989
Author
DOI-BOR
Title
Salinity Update - September 1989
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. . , <br />_d~ <br /> <br />USDA held operating <br />procedures workshops <br /> <br />USDA workshop" were held in <br />Grand Junction and Vernal. Utah. At <br />these workshops, USDA personnel <br />received training on their responsibilities <br />for prognm implementation. In addi. <br />tion. issues and concerns were voiced by <br />members of the local salinity coordinat. <br />ing committee. <br /> <br />Participants included representation <br />from ASCS, ASC County Committees. <br />SCS, Extension Service, Bureau of <br />Reclamation, Fish and Wildlife ServiC'e. <br />the local Soil Conservation District, and <br />othen. <br /> <br />lower Gunnison Basin <br />f4 'Under the cooperative agreement <br />~th the Uncompahgre Valley Water <br />Users AS!lOCiation, Reclamation has <br />obtained an inventory of the water <br />system needs for Reclamation's Winter <br />Water portion of the project. One of <br />three water suppliers is expected to be <br />ready for construction in fiscal year <br />19SU. The other two suppliers will <br />probably have to complete their designs <br />in fiscal year 1990 because of a shortage <br />of funds in fiscal year 1989. <br /> <br />The Appropriations bill for energy <br />and water development (including <br />Reclamation) for fiscal year 1990 <br />includes $2.5 million for initiating <br />construction activities in the Winter <br />Water portion of the Lower Gunnison <br />Basin Unit. <br /> <br />In the North Fork area. no viable <br />plan has been found and a concluding <br />report is being prepared. <br /> <br />" <br /> <br />WYo."'" <br /> <br />I f <br /> <br />\x1ll..__ <br /> <br />UTAH <br /> <br />, <br /> <br />...""'" <br /> <br /> <br />"'W <br />,." <br /> <br />, <br /> <br />_.- <br />. ../ <br />_.~.........../ <br />..._.~. <br />-~-'- <br />/.-,- <br />-:! .', II!\'';';;--;- <br />c._ .,.._.~..... <br />. ~_.",~.._ca.o <br />'-.... <br />J---"'- <br />o-~- <br /> <br />I <br /> <br />~ <br /> <br />---"- <br />"-~""-",- , <br />--- <br /> <br />\:-,- --- <br />1It__,,_, if <br />,- <br /> <br /> <br />,.,-~'~ -- <br />CAlF <br />, ~_....... <br /> <br />~ <br />....-.......- <br />.' <br /> <br />....--- <br /> <br />,.,.- 1 <br />......-- <br />----- <br />-.- <br /> <br />...._...Rod....._ <br />l.oI_,."""',...,......., <br />o~_ <br />. Be" <br /> <br />Units of Or ColorlUlo Rtve-r W41er QW1lity Jmpro~t Program <br /> <br />Paradox Valley Unit, Colorado <br /> <br />The facility will be essentially com- <br />plete this summer and ready for test <br />injection pending the selection and test. <br />ing of chemical precipitate inhibitors. <br />Samples taken from the primary injec- <br />tion formation. the Leadville Formation, <br />show that without the use of chemical <br />~e injcct~on brine witre~Cr/ <br />. ~ady In the formation to <br /> <br />form about 30 tons of solids per day. <br />Reclamation. through contracts with <br />private consultants, OOE, and USGS <br />geothermal experts, is evaluating the <br />performance of several different mixes <br />of inhibitors. Reclamation is also evalu- <br />ating the effectiveness of preflooding to <br />prevent the mixing of the two brines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.