My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00813
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC00813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:07:30 AM
Creation date
10/9/2006 2:22:02 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.300.03
Description
Colorado River Basin Threatened-Endangered Species - SJRIP - General Correspondence
State
CO
Basin
San Juan/Dolores
Water Division
5
Date
7/1/2000
Author
Unknown
Title
San Juan River Basin Recovery Implementation Program - Presentation Materials-Transparencies - RE-SJRIP Draft Annual Budget FY-2001 - Approximately 07-01-00
Water Supply Pro - Doc Type
Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- - - .. - - ... .... ~ ..' ... ... <br /> <br />- <br /> <br />... <br /> <br />... ~ <br /> <br />- <br /> <br />San Juan River Basin Recovery Implementation Program <br /> <br />Q <br />Q <br />Draft Annual Budget - Fiscal Year 2001 N <br />00 <br />l"':> <br />c;J1 <br /> <br />Page # Title Agency Program BIA Direct Other Total Base or <br /> Direct Capital <br />IV. Recovery Efforts <br />56 Nonnative Species Control FWS, Abq $ 117,240 $ 117,240 B <br />63 Razorback Sucker Augmentation FWS, GJ. $ 62,600 $ 62,600 C <br /> Augmentation Plan - Colorado <br />6.9 Pikeminnow FWS, G.J. $ 17,400 $ 17,400 C <br />71 Genetics Management Plan BOR $ 7,920 $ 7,920 B <br /> Experimental Culturing and Stocking NMDGF, <br />74 of Roundtail Chub CDOW,UNM $ 20,000 $ 20,000 <br />no pg # Pit tags BOR $ 40,000 $ 40,000 C <br /> subtotal $ 245,160 $ 20,000 subtotal $ 265,160 <br />V. Hydrology Committee Proposals <br />81 San Juan RIP Naturalized Flows BOR $ 400,000 $ 400,000 B <br /> Improve Stream Gaging and Flow B <br />92 Measurements BOR $ 21,708 $ 21,708 <br />94 Additional Model Runs BOR $ 10,000 $ 10,000 B <br /> subtotal $ 431,708 subtotal $ 431,708 <br /> <br />vi <br />
The URL can be used to link to this page
Your browser does not support the video tag.