Laserfiche WebLink
<br />'~ 0 lj G 2 6 5 <br /> <br />7 Program Milestones <br /> <br />This program is scheduled to have a duration of two years, coinciding with the final two years <br />of the INTEGRAL Project. The major milestones to meet our objectives are shown below, <br /> <br />Objective/Task <br /> <br />Due Date <br /> <br />CRSS Replacement <br />Requirements Analysis <br />Iterative Design <br />Prototype <br />Operational <br /> <br />Feb 94 <br />Jun 94 <br />Dee 94 <br />Jun 95 <br /> <br />24-month Study Replacement <br />Requirements Analysis <br />Iterative Design <br />Prototype <br />Operational <br /> <br />Feb 95 <br />Jun 95 <br />Aug 95 <br />Dec 95 <br /> <br />LC Operations Model <br />Requirements Analysis <br />Iterative Design <br />Prototype <br />Operational <br /> <br />Mar 94 <br />May 94 <br />Jul94 <br />Oct 94 <br /> <br />DC Operations Model <br />Requirements Analysis <br />Iterative Design <br />Prototype <br />Operational <br /> <br />May 94 <br />Aug 94 <br />Dee 94 <br />Jun 95 <br /> <br />9 <br />