Laserfiche WebLink
<br />, I... <br /> <br />000586 <br /> <br />WATER SUPPLY (average annual acre-feet) <br /> <br />Increased water supply by states (acre-feet) <br />Colorado <br />Wyoming <br />Total <br /> <br />STREAM DEPLETION (acre-feet annually) <br /> <br />Colorado <br />Wyoming <br />Total <br /> <br />PROJECT COSTS (preliminary) <br /> <br />Features construction costs (January 1971 prices) <br /> <br />STATUS <br /> <br />37,000 <br />29,000 <br />66,000 <br /> <br />15,100 <br />11.500 <br />20,600 <br /> <br />$45,080,000 <br /> <br />,. <br />o <br />, <br />, <br /> <br />~ <br /> <br />Preconstruction studies, for the project were initiated in October <br />1905. These studies, which have been retarded somewhat because of <br />federal funding conditions, are now essentially complete and the <br />preconstruction report is slated for completion by the end of June <br />1971. The Bureau is prepared to initiate project construction as <br />soon as funds are made available by Congress. <br /> <br />3 <br /> <br />~ <br />\,.j <br />! <br /> <br />, <br />[ <br />