Laserfiche WebLink
<br />." <br /> <br />E,RAFT <br /> <br />. <br /> <br />. <br /> <br />TABLE r.t <br /> <br />- <br /> <br />ASSUl-IEO MINI~llP.1 STRE..l\M FT.."Q\'/S - CFS Y <br /> <br />-Proj ect. Y <br /> <br />April thro,lJgh <br />Se"Otember <br /> <br />Octol:ler through <br />March <br /> <br />Stillwater Project <br /> <br />South Fork-Piceance Pipeline <br /> <br />80 <br /> <br />40 <br /> <br />Yellow Jacket Project <br /> <br />. <br /> <br />Yellow Jacket Can~l <br />Ripple Creek Reservoir <br />Lost Park Reservoir <br /> <br />125 <br />100 <br />10 <br /> <br />80 <br />60 <br />.5 <br /> <br />,Ertl pipel.ine <br />(Below'each direct diversion decree) <br /> <br />5 <br /> <br />5 <br /> <br />Sweetwat.er Project <br />(Aggregate below three direct <br />diversion decrees) <br /> <br />50 <br /> <br />30 ' <br /> <br />Rangely Project <br />(Below Range1y Res. and Douglas <br />: Canal) , <br /> <br />200 <br /> <br />lOO <br /> <br />Colorado-Utah State Line <br /> <br />250 <br /> <br />100 <br /> <br />'. <br /> <br />~ <br /> <br />. <br /> <br />1/ Minimum stream flow or natural stream flow, "hichever is less. <br /> <br />2/ All other future projects listed in Table IIasslli~ed to be unrestricted <br />as to minimum stream flows. <br /> <br />0266 <br /> <br />" <br /> <br />- 15 - <br /> <br />~ 'V <br />,\J':-' <br />, <br />