My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00578
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC00578
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 7:49:42 AM
Creation date
10/9/2006 2:15:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8045
Description
Section D General Studies-Federal Projects-General
Date
12/1/1979
Title
Moon Lake Power Plant Project-Reports 1979-80-Position Statement on the Rangely Reservoir
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />, <br /> <br />PO?ULATIO:<I <br /> <br />'. <br /> <br />T"ne best estimates of ~ersonn~l required by the oil sha~e industry show that <br /> <br />the pe~.anent staff would be about 1,100 persons p~~ 50,000 BPD of oil shale <br /> <br />plant capacity. Each full-timeernployee repre~ents an additional popula- <br /> <br />tion of from 4 to 6 persons as family l7Iembe:es plus service personneJ. 2.~soC'iated <br /> <br />with allied industries. Ass~~ng a total plant capacity of l,500,000 BPD, <br />. <br /> <br />the future population as a result of the oil shale industry "auld be between <br /> <br />150,000 to 180,000 persons. For the base problem file, the ass~"ption was <br /> <br />made that 100,000 people would settle on the yfuite River basin by the time <br /> <br />ultimate development would be reached. <br /> <br />'. <br /> <br />. <br />. <br /> <br />0,2 'I,? <br /> <br />4 - <br /> <br />\ <br />, \V <br />-{.:\.... <br />I <br /> <br />.---'-'- -.--..... <br />
The URL can be used to link to this page
Your browser does not support the video tag.