Laserfiche WebLink
<br />oonno <br /> <br />viable process for long-term funding. The feasibility study and application <br /> <br />process for a CWCB loan is streamlined for potential projects because Tasks 1 <br /> <br />through 3 have accomplished much of what is required, An objective of this <br /> <br />lower South Platte River investigation is to have a process in place that new <br /> <br />projects and ideas can be "plugged into" and carried easily and efficiently <br /> <br />through funding and construction. <br /> <br />TASK 5 - Preparation of reports <br /> <br />Annual progress reports will be prepared by the South Platte Lower River Group <br /> <br />so that CWCS and others can see methodology and accomplishments. These <br /> <br />reports will include hydrologic analysis conducted during Task 1. Any GIS <br /> <br />databases developed during Task 1 will be available to the CWCS. The matrix <br /> <br />discussed in Task 2 will be included along with reports on specific site <br /> <br />investigations and demonstrations, <br /> <br />ji/fglms\\TdIL:secd/splrg.doc <br />