Laserfiche WebLink
<br />OOJ778 <br /> <br />reservoir such as Julesburg Reservoir might be altered to provide additional <br />storage. <br /> <br />When investigating ditch systems for the potential of recharge and reservoir <br /> <br />sites, the potential for enhanced ditch system management to benefit water <br /> <br />supply objectives will also be discussed. This might include river headgate <br /> <br />improvements, ditch checks, equalization reservoirs, canal lining, conjunctive <br /> <br />measurement and other water control features, <br /> <br />Numerous water users entities in the lower river currently have projects being <br /> <br />planned and developed. The participants of the South Platte Lower River Group <br /> <br />can provide technical assistance to these projects in such areas as <br /> <br />measurement structures, groundwater modeling, and recharge/augmentation <br /> <br />accounting. <br /> <br />A matrix will be developed to compare various water supply options. This matrix <br /> <br />will include type of project, potential use, water supply and yields, capital costs, <br /> <br />operation and maintenance costs, permit requirements, development time, <br /> <br />constraints, wildlife issues, funding sources, benefiUcost, and priority among <br /> <br />options. <br /> <br />TASK 3 - Demonstration Proiects <br />