My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00543
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC00543
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:50:30 AM
Creation date
10/9/2006 2:15:04 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.A
Description
Colorado River Threatened-Endangered - UCRBRIP - Program Organization-Mission - Workplans
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
2/5/2003
Author
UCRBRIP
Title
Upper Colorado River Endangered Fish Recovery Program - Fiscal Year 2004 and 2005 Program Guidance - Draft - 02-05-03
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-,,~. -.,', <br /> <br />00\3474 <br /> <br />C-26a HARTLAND FISH <br />PASSAGE <br /> <br />$0/ <br /> <br />$75,000 <br />Construction of fish passage at the Hartland Diversion Dam, (On hold pending <br />determination of need [Gunnison River /Aspinall temperature modeling report will be <br />complete in September 2003,].) <br /> <br />C-26b HARTLAND FISH <br />SCREEN <br /> <br />$0/ <br /> <br />$45,000 <br />Construction offish screen at the Hartland Diversion canal. (On hold pending <br />determination of need [Gunnison River /Aspinall temperature modeling report will be <br />complete in September 2003,].) <br /> <br />C-6 FLOODPLAIN HABIT AT RESTORATION PROGRAM - The floodplain habitat <br />restoration program is undergoing assessment, thus continuation and cost of <br />acquisition/assessment activities is unknown until that assessment is complete. The habitat <br />restoration program and a proposal for sub-basin and site-specific management plans will <br />be discussed at upcoming Biology and Management committee meetings, <br /> <br />-Screen sites for contaminants (#C-6 umb) <br />-Hydrology/Geomorphology (#C-6 hyd) <br />a, Pre- and post-restoration assessments <br />b, Development of design options for restoration <br />c, Construction oversight <br />-Site and Sub-basin management plan implementation <br />-Land acquisition activities (#C.6 land) <br />-Easement and weed management (O&M) (#C-6 easement) <br />-Levee removal construction (#C-6 umb) <br />-Evaluation of razor backs stocked into depressions (#C.6 rz) <br />-Evaluation ofbonytail stocked into depressions (#C-6 bt) <br />-Evaluation oflarval entrainment (#C-6 rz entrainment) <br />-Floodplain restoration (#75) <br />-Stewart Lake management plan (#117) (On hold pending results of selenium remediation <br />efforts, ) <br /> <br />COMPLETED/DISCONTINUED PROJECTS <br /> <br />C-6rz model RAZORBACK SUCKER HABITAT MODEL <br />The habitat model is scheduled for completion in March 2003, <br /> <br />2004--2005 Program Guidance, <br />
The URL can be used to link to this page
Your browser does not support the video tag.