Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1365 <br /> <br />TABLE OF CONTENTS <br /> <br />TASK 0 & E REPORT <br />UTE MOUNTAIN UTE LA PLATA WATERSHED <br /> <br />Page <br />0.1 GENERAL 1 <br /> <br />0.2 SELECTION OF PARCELS FOR OFF-FARM DESIGN 2 <br /> <br />0.3 OFF-FARM IRRIGATION TRANSMISSION <br />SYSTEM COST 4 <br /> <br />0.3.1 General <br />D.3.2 Pumping Stations <br />0.3.3 pipelines <br />0.3.4 River Diversion Structures <br />0.3.5 Other Costs <br />0.3.6 Other Cos ts Not Included <br /> <br />4 <br /> <br />4 <br /> <br />5 <br /> <br />5 <br /> <br />7 <br /> <br />8 <br /> <br />0.4 PRELIMINARY PRACTICABLE IRRIGABLE ACREAGE 8 <br /> <br />0.4.1 Existing Irrigated Lands <br /> <br />8 <br />8 <br />9 <br /> <br />0.4.2 Water Supply <br /> <br />0.4.3 Cropping Pattern <br /> <br />0.4.4 preliminary PIA Analysis <br /> <br />9 <br /> <br />APPENDICES <br /> <br />Appendix 0.1 preliminary PIA Analysis <br />