My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00304
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:48:53 AM
Creation date
10/9/2006 2:04:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.I
Description
Colorado River Water Projects - Animas La Plata - Environmental Studies
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
4/15/2004
Author
DOI-BOR
Title
Animas La Plata Project - Environmental Commitment and Monitoring Plan
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />------------------- <br /> <br /> ordinary high water marks and protected by above the ordinary high water marks and <br /> measures to prevent erosion of those materials protected by measures to prevent erosion of those <br /> into waters of the United States materials into waters of the United States. <br />. Silt screens or other appropriate methods will Silt screens or other appropriate methods have <br /> be used in BC, AR, and pipeline crossings of been used in BC and the AR. No work on the <br /> the SJR to confine suspended particulates and San Juan River has been done during 2003. <br /> turbidity to areas where settling or removal can <br /> occur <br />. The DPP will be designed to allow for the free The Durango Pumping plant has been designed as <br /> unrestricted movement of groundwater on the much as practicable for the unrestricted <br /> site. Groundwater levels and quality will be movement of groundwater. Observation wells <br /> measured at a series of wells agreed upon by continue to be monitored on a quarterly basis. <br /> US Department of Energy (US DOE) and State All necessary discharge permits were obtained. <br /> of Colorado (Colorado). The Construction All water removed during dewatering operations <br /> contractor and lor Reclamation will secure a has been monitored for quality. Because of the <br /> discharge permit for the DPP from the quality of the water, no contingency plan was <br /> appropriate agency; regular monitoring of the required during 2003. <br /> water removed during the dewatering <br /> operations will be required. The contractor <br /> will be required to prepare and implement, if <br /> necessary, a contingency plan for treating the <br /> water removed during excavation in the event <br /> groundwater contamination levels exceed <br /> anticipated limits. <br />. Comply with applicable state water quality During 2003 all standards were complied with. <br /> standards under Section 313 of the Clean <br /> Water Act (CW A). Overall, the project is <br /> designed to comply with Sections 401, 402, <br /> 404 of CW A standards. <br /> <br />4 <br /> <br />c:::> <br />o <br />c:::i <br />00 <br />00 <br />w <br />
The URL can be used to link to this page
Your browser does not support the video tag.