My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00304
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:48:53 AM
Creation date
10/9/2006 2:04:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.I
Description
Colorado River Water Projects - Animas La Plata - Environmental Studies
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
4/15/2004
Author
DOI-BOR
Title
Animas La Plata Project - Environmental Commitment and Monitoring Plan
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />------------------- <br /> <br />1-3 Reclamation will follow commitment made in the 2002 5-3 The commitments were followed, The Federal <br /> FSEIS during the relocation of Gas Pipelines and FRFEA Energy Regulatory Commission staff's Plan and <br /> utilities relocation necessary for ALP construction, Procedures were included in the contracts for the <br /> Reclamation commits to the implementation of the relocation of the gas pipelines and were adhered <br /> pertinent portions of the Federal Energy to by the relocation contractor. Re-vegetation <br /> Regulatory Commission staff's Plan and plans developed by the utility owners and <br /> Procedures for the Northwest Pipeline Corporation approved by FERC and adjoining ROW land <br /> and Mid-American Pipeline Corporation pipelines owners were followed. <br />2 - Water Resources and Hvdrolol!V Commitments <br />2-1 Reclamation will develop an operations plan for 2000 FSEIS 5-11 This operation plan has not been developed; <br /> the Durango Pumping Plant (DPP) that will however, it will become a part of the standard <br /> schedule pumping from the Animas River (AR) in operating procedures for the pumping plant when <br /> a manner to limit impacts to non-Colorado Ute it is developed, , <br /> Tribal entity's abilities to obtain water from the <br /> San Juan River (SJR) <br />2-2 Reclamation, in concert with State and Federal 2000 FSEIS 5-11 Some planning outside of the ALP has been <br /> agencies, will pursue a method to protect ALP taking place to take municipal water to the La <br /> water return flows in the La Plata River (LPR) Plata River Basin; however, no action on this <br /> drainage as a water supply for endangered fish. commitment will take place until a more firm <br /> plan is formulated. <br />2-3 Reclamation will design and develop the Ridges 2000 FSEIS 5-11 A 30,000 af minimum pool has been included in <br /> Basin Reservoir with a minimum pool of 30,000 the design for Ridges Basin Reservoir. <br /> acre-feet (at), <br />2-4 For project operation a stream flow gauging station Action on this commitment will not take place <br /> will be constructed on the Animas River a short until approximately 2007, <br /> distance below the intake to the Durango Pumping <br /> Plant. <br />3 . Water Quality Commitments <br />3-1 Reclamation will develop and implement a 2000 FSEIS 5-11 Best Management Practices (BMPs) and <br /> program to reduce, minimize or eliminate sediment control structures are being used to <br /> <br />2 <br /> <br />Q <br />C <br />Q <br />00 <br />00 <br />,--,,' <br />
The URL can be used to link to this page
Your browser does not support the video tag.