Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />0008,)7 <br /> <br />(2) Contractor and subcontractors shall comply with all applicable federal, state, and <br />local laws, orders and regulations, concerning water quality, air quality, noise, <br />lighting and hazardous wastes, and comply with all terms and conditions of <br />applicable permits. If there is a conflict between federal, state and local laws, <br />regulations, and requirements, the most stringent shall apply. <br />(3) Third party developers of end uses of project water will also be required to abide <br />to the commitments in 1 and 2 above. <br /> <br />16) Noise - Noise generated during construction of the Durango Pumping Plant and Ridges <br />Basin Inlet Conduit could disturb nearby residents and other sensitive receptors. Noise from <br />dynamite blasting for pipeline trenching and foundation excavation could exceed local noise <br />standards and disturb nearby residents and other sensitive receptors, Operation of the <br />Durango Pumping Plant could generate noise levels that could exceed local standards and <br />disturb recreationists at Santa Rita Park and on the Animas River. Noise generated by the <br />construction of Ridges Basin Dam, the relocation of CR 211, gas pipeline relocation, and the <br />construction of a recreational area and noise generated by recreational activities associated <br />with public recreation in Ridges Basin Reservoir and the potential adjacent recreation area <br />could disturb golden eagle nesting on Carbon Mountain, Construction of the end uses and <br />conveyance systems identified under the non-binding scenario could generate noise that <br />could disturb nearby sensitive receptors. <br /> <br />a) Avoidance/minimization: <br />i) By Design: <br />(1) Durango Pumping Plant: <br />(a) Noise reduction will be provided in the form of sound insulation within the <br />pumping plant and vegetative screening designed as part of site landscaping. <br />The pumping plant will be blended into the natural land to the extent <br />practicable. <br />(2) Recreational Development: <br />(a) Third-party developers of recreational facilities at Ridges Basin will be <br />required to incorporate into a recreational development/management plan <br />requirements that prohibit particularly loud forms of water craft on Ridges <br />Basin Reservoir. <br />ii) General Construction: <br />(1) All ALP Project Facilities: <br />(a) Specifications will include noise, traffic, and human use restriction to <br />minimize disturbance to wildlife near the construction zone. <br />(b) Prior to blasting, nearby residents and commercial establishments will be <br />notified by mail of expected blasting dates and times. Similar notification will <br />also be posted in the surrounding area. Immediately in advance of blasting, <br />the construction contractor(s) will be required to sound a signal announcing <br />the blast. <br />(c) Contractor and subcontractors shall comply with all applicable federal, state, <br />and local laws, orders and regulations, concerning water quality, air quality, <br /> <br /> <br />31 <br />