My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00304
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:48:53 AM
Creation date
10/9/2006 2:04:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.I
Description
Colorado River Water Projects - Animas La Plata - Environmental Studies
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
4/15/2004
Author
DOI-BOR
Title
Animas La Plata Project - Environmental Commitment and Monitoring Plan
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />~ <br /> <br />Oi}ilSu5 <br /> <br />ii) General Construction: <br />(1) Ridges Basin Dam and Reservoir, Inlet Conduit, Gas Pipelines Relocation, <br />Durango Pumping Plant and CR 211 Relocation: <br />(a) Prohibit contractors from disturbing the Bodo Canyon UMTRA disposal cell. <br />(b) Requirements to follow for handing and management of hazardous materials, <br />mixed wastes and radioactive wastes will be included in all construction <br />specification, <br />(c) Ensure that the construction contractor(s) adhere to all federal and state <br />requirements pertaining to the management and handling of hazardous <br />materials, mixed waste, and radioactive waste. <br /> <br />b) Monitoring: <br />i) Durango Pumping Plant: <br />(1) The hazardous material of greatest public concern in relation to the project is <br />radioactive waste from historical uranium processing that may be found in soil <br />and groundwater which could be disturbed by project construction activities. <br />Groundwater levels and quality will be monitored at a series of wells on the site <br />as agreed upon with the Department of Energy and the State of Colorado in <br />conjunction with Reclamations restricted use plan for the site. Details of water <br />quality monitoring at the Durango Pumping Plant construction site can be found <br />in the 2) Water Quality (2.c.ii), <br />ii) All Project Facilities: <br />(1) With construction activities hazardous materials will be brought onto the <br />construction sites. Permits requirements and environmental compliance adequacy <br />will be monitored by Reclamation construction inspectors and contractor <br />compliance technicians <br />(2) There is concern that hazardous material located in the Bodo Canyon UMTRA <br />Disposal Site could get into Ridges Basin Reservoir. To verify if this is or is not <br />happening Reclamation will sample and monitor on a quarterly basis DH-228 and <br />DH-229 for indicators parameters including but not limited to molybdenum, <br />selenium, and uranium. <br /> <br />14) Transportation - Increased delays at the intersection of west frontage road and CR 211 and <br />the intersection of U.S. highway 550/160 could result from construction worker peak hour <br />commute trips during the construction of the structural components of the ALP Project. <br />Physical degradation of CR 211 could also occur as a result of construction vehicle traffic <br />associated with construction of the structural components of the ALP Project. <br /> <br /> <br />a) Avoidance/minimization: <br />i) General Construction: <br />(1) Ridges Basin Reservoir: <br />(a) Reclamation will a conduct a traffic survey and if determined necessary, the <br />contractor will implement methods to reduce construction traffic impact <br /> <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.