Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />169G <br /> <br />pceliminacy Payment Capacity: The pceliminacy net <br />minus the on-facm iccigation capital, maintenance, <br />pumping cost in dollacs per acce. <br /> <br />ag. returns <br />laboc, and <br /> <br />Watec Soucce Elevation: The watec soucce divecsion point nominal <br />elevation. <br /> <br />Static Lift: The difference in elevation of the parcel's high <br />elevation and and watec soucce elevation in feet. <br /> <br />Annual Power Cost/Acre: The cost of electrical energy per acre per <br />yeac to secve the paccel considering only the static lift in the case <br />of gravity irrigation oc the static lift plus 139 ft. (60 psi) for all <br />types of sprinkler iccigation. <br /> <br />Residual preliminacy Payment Capacity: The result of the preli- <br />minary payment capacity minus the annual power cost for pumping at <br />the water supply source in dollars per acre. <br />