My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00271
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:48:45 AM
Creation date
10/9/2006 2:03:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/31/1997
Title
Boyle IIIa WRP Enhancement-Amendment 1-Phase IIIa Scope of Services-Exhibits A-D-Tasks 1-11.02
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Objective: For the Boyle Group to gain necessary background on the capabilities and limitations of the <br />utility programs that access the database and manipulate the data. <br /> <br />Approach: <br />I. Boyle: Brief review of On-Line documentation and man pages of the watright, demandts, tstool <br />and crdssgr programs to gain a' familiarity with those OMIs. <br />2. Boyle: Through a CROSS workstation login session exercise each OM! through several of the <br />examples provided on the man page. ' <br />3. STATE: Ray Alvarado will.be available during the OMI review process to facilitate an <br />understanding of those data utilities (budgeted for 2 hours), <br /> <br />Deliverables: <br />I. Boyle familiarity, through documentation review, of primary CROSS data management interfaces, <br />2. Boyle familiarity, through example applications, of primary CROSS data management interfaces, <br />3. State support of Boyle familiarization with primary CROSS DM!s. <br /> <br />Task 1.08 <br /> <br />Review the Consumptive Use Model and GIS Basis <br /> <br />Objective: To have the Boyle group become familiar with the consumptive use modeling envirolU11ent <br />. which will be required for the proper development of the irrigation structure demands in thc watcr <br />resource planning models. <br /> <br />Approach: <br />1. Boyle: Review On-Line documentation for the consumptive use modeling tool and interface while <br />exercising the various features of the tool and interfaee. <br />2. Boyle: Review the On-Line documentation and examples of process to calculate consumptive use <br />demands for StateMod modeled structures and create StateMod input file (* ,ddm), <br />3, STATE: Ray Alvarado will be available during the CU model and GIS basis review process to <br />facilitate an understanding of those system features (assumed 2 hours). <br /> <br />Deliverables: <br />1. Boyle familiarity, through documentation review and exercising the features of the interface, with <br />the consumptive use program. <br />2. Boyle familiarity, through documentation review and example applications, with the linkage <br />between the water resource planning model and the consumptive use program. <br />3, State support of Boyle familiarization with consumptive use model and StateMod linkage. <br /> <br />Task 1.09 <br /> <br />Report on CRDSS Component Areas of EffeetivenesslDesired Enhancement <br /> <br />Objective: To provide constructive, written feedback on CROSS components based on Boyle's <br />. familiarization and usage process. This feedback is valuable since is comes from a fresh aspect outside <br />the Phase II development team. <br /> <br />Phase lIIa Scope of Services <br /> <br />1180 <br /> <br />A-4 <br /> <br />Jan31,1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.