My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00271
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:48:45 AM
Creation date
10/9/2006 2:03:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/31/1997
Title
Boyle IIIa WRP Enhancement-Amendment 1-Phase IIIa Scope of Services-Exhibits A-D-Tasks 1-11.02
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Exhibit A <br />Phase IIIa Scope of Services: <br /> <br />Task IIIa-l <br />Review <br /> <br />Hardware/Software Acquisition. Boyle Familiarization & <br /> <br />Objective: To facilitate the acquisition of proper hardware and software, and associated familiarization, <br />so as to allow the Boyle Group to provide effective teclmical services and management during Phase <br />IlIa. To have Boyle provide a written review of CRDSS component strengths and weaknesses based <br />on their exposure to the CRDSS system during Phase IlIa, <br /> <br />Task Leader: Meg Frantz (Boyle) <br />Task 1.01 Hardware and Software Needed for CRDSS Access. <br /> <br />Objective: The Boyle and RTi groups need to be able to effectively communicate with existing <br />CRDSS team members and acquire the tools necessary for the Phase IlIa enhancement of the water <br />resource basin models, <br /> <br />. Prerequisite: Before Task 2, the CRDSS 2nd Year Consulting Team will prepare two workstations (I <br />CRDSS SGI Indy workstation with Mosaic, On-Line documentation, StateMod program, StateMod <br />GUI, StateMod River Basin applications, consumptive use model, VDB, and maps but no relational <br />database, and an Indigo I SGI workstation containing the WRPM program, interface and river basin <br />applications). <br /> <br />Approach: <br />I. Boyle: Initiate a frame relay internet connection (>=56 kbps) with a service provider such as <br />Colorado Supernet. $ 100/month will be made available during Phase IlIa contract period to partially <br />offset Boyle's costs of this connection. <br />2. RTISW: Maintain a frame relay internet connection throughout the Phase IlIa contract period. $ <br />100/month will be made available during Phase IIIa contract period to partially offset RTi's costs of <br />this connection. <br />3. Boyle: Install two SGI workstations (Indy and an Indigo I) at Boyle offices. These two <br />workstations will be connected to the Internet described in Task I, <br />4. RTISW: Provide up to 20 hours of support by Steve Maiers in installing the two SGI workstations <br />at Boyle and initiating an internet connection at Boyle.. <br /> <br />Deliverables: <br />I. 56 kbps Internet connection between Boyle and other CRDSS locations. <br />2. 56 kbps Internet connection between RTi and other CRDSS locations. <br />'. 3. Two SGI workstations installed at Boyle's office. <br />4. Software/network support by RTi of Boyle's network and workstation environment. <br /> <br />Phase Illa Scope of Services <br /> <br />11.83 <br /> <br />A.I <br /> <br />Jan 31,1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.