Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1625 <br /> <br />SAN JUAN WEST WATERSHED <br /> <br />TABLE D.I <br />PIPELINE COSTS <br /> <br /> y <br />Pipe Installed Cost - $/ft <br />Diamet. 100 150 200 250 300 350 <br />(inch) psi psi psi psi psi psi <br />4 10.50 11.00 11.50 12.00 12.50 13.00 <br />6 12.00 12.50 13.00 14.00 14.50 15.00 <br />B 15.50 16.00 17.00 17.50 lB. 50 20.00 <br />10 20.00 21.00 22.50 23.50 25.00 26.50 <br />12 24.00 26.50 2B.50 31.00 33.00 35.00 <br />14 2B.50 32.00 35.00 38.00 41.00 44.00 <br />15 31. 00 34.50 3B.50 42.50 45.50 49.00 <br />16 34.00 37.50 42.00 46.00 50.00 54.00 <br />18 41. 00 45.00 50.00 54.00 59.50 65.00 <br />20 48.50 53.00 58.00 63.50 69.00 75.00 <br />21 50.50 55.50 60.50 66.00 71.50 77.00 <br />24 62.00 69.00 75.50 82.00 B8.50 95.50 <br />27 75.50 B2.00 88.50 96.50 104.00 112.00 <br />30 89.50 96.50 103.00 111. 00 120.00 128.50 <br />33 104.50 111.00 116.50 126.50 13 7.50 148.50 <br />36 U5.50 In.OO 13 0.50 142.00 155.00 166.00 <br />42 130.50 13 6.00 143.00 155.00 170.00 181. 50 <br /> <br />!I Unit construction cost including 10% allowance for <br />appurtenances. <br /> <br />6 <br />