My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00157
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00157
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:48:18 AM
Creation date
10/9/2006 1:59:10 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8064.100
Description
Ute Tribes
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
6/1/1987
Author
CO Dept of Law
Title
Agricultural Engineering Study - San Juan West Watershed - Final Report - Design-Cost Estimate for Off-Farm Irrigation Facilities and PIA Determination
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1(j,~3 <br /> <br />costs. The Task B report, however, estimated land leveling <br /> <br /> <br />quantities in the range of one foot average cuts at a cost of $0.50 to <br /> <br /> <br />$1.00 per cubic yard. As a conservatively low estimate, an average <br /> <br /> <br />6-inch cut at $0.50 per cubic yard for a total cost of $403 per acre <br /> <br /> <br />was assumed for this Task D analysis. Amortizing this cost at 8-3/8 <br /> <br /> <br />percent interest over 50 years gives a cost of $34.40, or in round <br /> <br /> <br />numbers, $35 per acre. This cost was then included in the on-farm <br /> <br /> <br />costs for gravity irrigation. <br /> <br />D.3 OFF-FARM IRRIGATION TRANSMISSION SYSTEM COST <br /> <br /> <br />0.3.1 General <br /> <br /> <br />The off-farm irrigation transmission facilities will generally <br /> <br /> <br />consists of transmission pipelines, pumping stations, and diversion <br /> <br /> <br />facilities. Roads for access to pump stations; rights-of-way; and <br /> <br /> <br />the extension of electrical power services to pumping stations were <br /> <br /> <br />not included in the cost analysis. Costs for those items included <br /> <br /> <br />are based on experience with similar facilities. All costs at:e then <br /> <br /> <br />amortized using a discount rate of 8-3/8 percent over a 50 year <br /> <br /> <br />pro ject 1 He. <br /> <br />0.3.2 pumping Stations <br /> <br /> <br />Pump station costs were estimated using an equation which considers <br /> <br /> <br />flow and horsepower as variables. The equation is based on Boyle's <br /> <br /> <br />experience with various size agricultural pump stations which <br /> <br /> <br />include pump motor, pump stt:ucture, valves, surge control, and power <br /> <br />panel. The equation is: <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.