My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00151
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:48:17 AM
Creation date
10/9/2006 1:58:51 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.400
Description
Colorado River Basin - Basin Briefing Documents-History-Correspondence
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
12/1/1997
Author
DOI-BOR
Title
Programmatic Environmental Assessment for Proposed Rule Making for Offstream Storage of Colorado River Water and Interstate Redemption of Storage Credits in the Lower Division States - Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />i"1i''\"I.., 'Q <br />UV.Lw,dl. <br /> <br />APPENDIX A <br /> <br />EXISTING ENVIRONMENTAL COMPLIANCE FOR THE CENTRAL ARIZONA PROJECT, <br />SOUTHERN NEVADA WATER SYSTEM, AND OPERATIONS, MAINTENANCE, AND <br />SENSITIVE SPECIES OF THE LOWER COLORADO RIVER <br /> <br />The Central Arizona Project (CAP) delivers Colorado River water through an approximately <br />330-mile long series of open canals, inverted siphons, pumping plants, and tunnels. Water is <br />diverted from Lake Havasu, transported east through Phoenix and then south to the southern <br />boundary of the San Xavier Indian Reservation southwest of Tucson. Under normal water <br />supply conditions, CAP diversions from the Colorado River are expected to be about 1.5 mafper <br />year of Arizona's basic annual apportionment of2.8 maf. The following NEPA documents were <br />completed for the CAP components noted <br /> <br />f <br /> <br /> <br />. Central Arizona Project <br /> <br />Final Environmental Impact Statement - 1972. Central Arizona Project. FES 72-35; <br /> <br />Ii <br /> <br />Final Environmental Impact Statement - 1973. Havasu Intake Channel, Havasu Pumping <br />Plant and Buckskin Mountains Tunnel. FES 73-2; <br /> <br />Final Environmental Impact Statement - 1974. Granite Reef Aqueduct. FES 74-5; <br /> <br />Final Environmental Impact Statement - 1975. Granite Reef Aqueduct Transmission <br />System. FES 75-66; <br /> <br />~ <br /> <br />Final Environmental Impact Statement - 1982. Water Allocations and Water Service <br />Contracting, Central Arizona Project. FES 82-7; and <br /> <br />The Master CAP Repayment Contract with CAWCD, Amendatory Contract, 1988. <br />CE LC-88-12. <br /> <br />Reclamation has consulted formally and informally with the Fish and Wildlife Service (Service) <br />on over 50 CAP-associated projects. In April of 1994, after three years of intensive formal <br />consultation with Reclamation, the Service issued a final Biological Opinion (BO) on the <br />Transportation and Delivery of Central Arizona Water to the Gila River Basin in Arizona and <br />New Mexico. The BO found that deliveries of CAP water would jeopardize the continued <br />existence of the spikedace (Meda fulgida), loach minnow (tiaroga cobitis), Gila topminnow <br />(poeciliopsis occidentalis), and razorback sucker and would adversely modifY the critical habitat <br />of the spikedace, loach minnow, and razorback sucker. Reclamation is now in the process of <br />implementing the reasonable and prudent alternative (RP As) and Terms and Conditions <br />presented in the BO. Reclamation's Phoenix Area Office is also preparing a biological <br />assessment (BA) on the delivery of water into the Santa Cruz River Basin. <br /> <br />LC Region DEAl I <br /> <br />1 <br /> <br />12197 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.