Laserfiche WebLink
<br />:'riO'il~S <br /> <br />4( <br /> <br />, <br /> <br />WORK COMPLETED BY CAMP B,R, #55 FROM' <br />January 1, 1939 to Decmeber 1, 1939, <br /> <br />Class. <br />No, <br />120---Garage Building <br /> <br />Unit <br />1. No; <br /> <br />202 ---Truck Trails <br /> <br />2~4 Mi. <br /> <br />403, 404, & 411 ~ Concrete paving, earth'excavation, and concrete structures, <br />(Note: This work reported from January 1, 1939 to January 1, 1940) <br /> <br />Projedt Length Base Vertical SQ.Yds, Structures Cu,Yds Con- Earth Ex- <br />Name Ft. Ft. Height Paving No. & Type crete in Stru- cavation. <br /> Ft, Placed ctures. Cu. Yds. <br />Otunes 300 2,0 2,5 302 ~14l <br />Fennessey 40 1.0 1,2 23 2 Parshall 50 <br /> Flumes ----- 10,5 <br /> 2 Turnouts--- 1;4 <br /> 1 Check ------ 1.0 <br />~ <br />Rasmussen <br /> 2085 1.0 1;5 1214 7 Parshall 1585 <br /> 873 1.0 1;2 900 Flumes with <br /> 24 1.0 1.25 15 turnouts. <br /> Checks, etc,---- 27,35 <br /> 1 drop with <br /> check -------- 4.0 <br /> 1 bridge ------- 2,0 <br /> 15" Pipe ------ 15 Feet. <br />Ottjes 1710 1.0 2,0 1272 2350 <br />Loibl 1 Parshall 15 <br /> flume with <br /> Headwalls '-- 3,0 <br /> 1 turnout ------ 0,5 <br /> 15" Pipe ------ 27 FeGt <br />Ll4E 1 Parshall 640 <br /> flume with <br /> turnout-------- 2,8 <br /> 1 diversion <br /> box------- 2,5 <br /> 1 valve box 0.7 <br /> 18" Pipe -------225 Feet, <br />L 15 E 1 drop. ~-4.5- 135 <br />