My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00006
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:47:49 AM
Creation date
10/9/2006 1:53:47 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272
Description
Colorado River - Colorado River Basin Salinity Control Program - CRBSCP
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
11/1/1990
Author
Unknown
Title
Meeting Municipal Needs with the Yuma Desalting Plant - Special Report - Second Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />f" -: r:::' ') <br />J l " !~. 0 > . <br /> <br />WATER DELIVERY AND DISTRIBUTION <br /> <br />To interconnect the Desalting Plant with city's water system, the <br />City would construct a pump station and conveyance system. The <br />pump station would be located at the product clearwell within <br />the boundaries of the Desalting Plant. The pumps would force the <br />water through a pipeline conveyance system providing adequate <br />pressure for distribution. since the pumping plant would be <br />located within the boundaries of the Desalting Plant, the power <br />would be purchased by Reclamation and provided through <br />Reclamation's switchyarct. The composite rate for Reclamation <br />power is currently projected at about 35 Mills/kWhr. This <br />compares to City purchased power at about 67 Mills/kWhr. <br /> <br />CONSTRUCTION COSTS <br />As provided by Carollo a summary of the construction costs for <br />the delivery system of Desalting Plant features are shown below <br />in Table 6. The costs estimates were prepared in 1990 prices and <br />escalated to 1993 prices using 6 percent simple interest. <br /> <br />--' <br /> <br />TABLE 6 <br />S~Y OF CONSTRUCTION COSTS - YUMA DESALTING PLANT ALTERNATIVE <br />DELIVERY SYSTEM AND PUMPING PLANT - 1993 DOLLARS <br />CAROLLO ENGINEERS <br />($1,000) <br /> <br />FEATURE 20 Mgal/d 30 Mgal/d 40 Mgal/d 70 Mgal/d <br />Delivery <br />Pipeline 2,042 11,247 4,032 13,489 <br />Delivery <br />Pump Sta 1,500 2,100 2,600 4,200 <br />Sub-Total 3,542 13,347 6,632 17,689 <br />+ 20% <br />contingen. 709 2,670 l,326 3,538 <br />+ 15% <br />Engr. & Ad 531 2,002 995 2,653 <br />. ,"' , '" . ~';.r. , '. <br />Total Cost <br />Delivery 4,782 18,019 8,953 23,880 <br /> <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.