Laserfiche WebLink
<br />-- <br />-- - -- - ~~ ~--~--- - ---------.- _.-..- ----------- <br />- , f'~"~Q <br /> T,. t.JO, <br /> IDENTIFICATION OF ALTERNATIVE COMBINATIONS <br />, <br /> To interconnect the Desalting Plant with the city's water system, <br /> Carollo Engineers conducted a hydraulic analysis and developed <br /> four combinations to reach a 70 Mgal/d ultimate capacity. The <br /> four alternatives combined increasing levels of Desalting Plant <br /> treatment with alternate City features. The alternatives <br /> developed were not the full range of options that could be <br /> considered, but were designed to allow analysis and determine how <br /> the Desalting Plant could interact with existing and planned city <br /> features. <br /> The alternatives include: <br /> BASE CITY PLAN <br /> PLAN'!' CAPACITY CONSTR. FINISHED <br /> SITE Mgals/d -(ac.ft/yr) OPER. BEGINS <br /> (Year) <br /> Main Street 20 -(15,447) EXIST <br /> Main Street 20 -(15,447) 1994 <br /> ,East Mesa 10 - (7,724) 2000 <br />, <br />-.~ East Mesa 10 - (7,724) 2010 <br /> East Mesa 10 - (7,724) 2020 <br /> ALTERNATIVE 1 <br /> PLANT CAPACITY CONSTR. FINISHED <br /> SITE Mgals/d -(ac.ft/yr) OPER. BEGINS <br /> (Year) <br /> Main Street 20 - (15,447) EXISTS <br /> Desalt Plant 20 - (15,447) 1994 <br /> East Mesa 10 - (7,724) 2000 <br /> East Mesa 10 - (7,724) 2010 <br /> East Mesa 10 - (7,724) 2020 <br /> 24 <br />