Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />\ <br /> <br />~,~anueIPineda <br />North Poudre Irrigation Company <br />December 4, 1997 <br /> <br />2 <br /> <br />d. An aooroved contract must be in Dlace before funds can be advanced, Jan Illian will <br />contact you concerning our contracting procedure, It usually takes 2 to 3 months to <br />complete the contract. <br /> <br />e, You must adhere to the CWCB Desi~n and Construction Administration Procedures, <br />~ike Serlet will work with you on the CWCB requirements concerning design and <br />bidding of the construction project. During the construction process he will make field <br />inspections, which will be the basis of the monthly pay estimates for disbursements of <br />your loan funds. <br /> <br />f. You must adhere to the CWCB Guidelines for Financial Assistance. A copy of our <br />Guidelines has been provided to your engineer. <br /> <br />On behalf of the Board, I would like to thank you for applying for a Construction Fund Loan from <br />the Colorado Water Conservation Board, <br /> <br /> <br />Sim:erely, <br /> <br /> <br />olin Van Sciver, P,E. <br />Colorado Water Conservation Board <br /> <br />Attachment: Updated Memo: NorthPoudrc97.memo <br /> <br />cc (w/Attachmenl): Ms. Elizabeth Ann Rieke, Board Member eWeR <br />Duane H. Smith. P.E., 1225 Red Cedar Circle. Suit H. FClrt Collins. CO 80514 <br /> <br />cc (wlo Attachment): CWCB Section B StafT <br />Linda Bassi, AGO <br /> <br />O:\NorthPoudre97.1tr <br />