My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153869 Contract
CWCB
>
Loan Projects
>
Backfile
>
3001-3102
>
C153869 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2014 3:07:22 PM
Creation date
10/6/2006 12:27:21 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153869
Contractor Name
Brown and Caldwell
Contract Type
Grant
Water District
0
County
Jackson
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-- <br /> <br />. <br /> <br />. <br />STAlE OF COLORADO <br /> <br />". . "'I"~ <br /> <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br /> <br />1313 Sherman Street Room 818 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 <br />FAX (303) 866-3589 <br /> <br />RECEIVED <br /> <br />NO\! J 0 LOG\} <br /> <br />November 27, 2000 <br /> <br />WATER RESOU\1('~S <br />STATE ENGINEE <br />COLO <br /> <br />Leo Eisel <br />Brown and Caldwell <br />7535 East Hampden Ave. <br />Suite 403 <br />Denver, CO 80231-4838 <br /> <br />Re: SPDSS - Feasibility Study, Amendment Authorization #1 <br /> <br />This letter authorized Brown and Caldwell to amend the date of delivery of Item 3.1, Data <br />Collection Report from November 30, 2000 to December 8, 2000. This amended date is due <br />to the volume of comments required and the resultant delay in obtaining all of the comments <br />from the State on the Draft Data Collection Report. It is anticipated Brown and Caldwell will <br />receive the final set of comments from the State by 8:00 am on November 28,2000. No <br />change in the budget is authorized by this amendment, If you concur with this authorization, <br />please indicate by signing below and returning the original signed copy of this letter to us. <br /> <br />As presented in Exhibit 1, SPDSS Feasibility Study Summary, $0.00 remains unauthorized <br />from the original Scope of Work. This includes a decrease of$O.OO associated with <br />Amendment Authorization # 1. <br /> <br /> <br />I 0-- tv,,", <br /> <br />Date <br /> <br />Ray, . Bennett, PE <br />RG SS Project Manager <br /> <br />Brown and Caldwell agrees to the terms of the SPDSS Feasibility Authorization #1. <br /> <br />~.e <br /> <br />II )<.-'1 J t9-.J <br />Date <br /> <br />P:\data\gen\spdss\contracts\amendment_l.doc <br /> <br />Page lof2 <br /> <br />11/29/00 <br /> <br /> <br />Bill Owens <br /> <br />r:,,,,,.~^P <br /> <br />Greg Walcher <br />Executive <br />Director <br /> <br />Hal Simpson <br />State Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.