My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153869 Contract
CWCB
>
Loan Projects
>
Backfile
>
3001-3102
>
C153869 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2014 3:07:22 PM
Creation date
10/6/2006 12:27:21 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153869
Contractor Name
Brown and Caldwell
Contract Type
Grant
Water District
0
County
Jackson
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,. <br /> <br />," <br />. <br /> <br />. <br /> <br />. <br />STATE OF COLORADO <br /> <br />., .>, <br /> <br /> <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br /> <br />8ECEIVEr..i <br />JAN 0 3 2001 <br /> <br />1313 Sherman Street Room 818 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 <br />FAX (303) 866-3589 <br /> <br />WATER RE50UHc.c5 <br />5r....TE ENGIh'EER <br />COlO <br /> <br />December 22, 2000 <br /> <br />Leo Eisel <br />Brown and Caldwell <br />7535 East Hampden Ave. <br />Suite 403 <br />Denver, CO 80231-4838 <br /> <br />Re: SPDSS - Feasibility Study, Amendment Aut <br /> <br />lZation #2 <br />I Z bo/ .-w.t <br />, . <br />This letter authorized Brown and Caldwell to ame the date of delivery of Item 1, <br />Introduction from December 31,2000 to January This amended date is due to the <br />holiday season and additional time required to allow for all interested parties to provide <br />comments on the draft. No change in the budget is authorized by this amendment. If you <br />concur with this authorization, please indicate by signing below and returning the original <br />signed copy ofthis letter to us. <br /> <br />As presented in Exhibit 1, SPDSS Feasibility Study Summary, $0.00 remains unauthorized <br />from the original Scope of Work. This includes a decrease of$O.OO associated with <br />Amendment Authorization # 1. <br /> <br />Sincerely, <br /> <br /> <br />! /7/0( <br /> <br />Date <br /> <br />R. Bennett, PE <br />DSS Project Manager <br /> <br />;; ~d g; .~~ tOt :'J:~::~ SPDSS P,,"biHry Auilioo~ioo #2 <br /> <br /> <br />Leo Eisel Date <br /> <br />P;\data\gen\spdss\contracts\amendment~ l.doc <br /> <br />Page I of2 <br /> <br />12122/00 <br /> <br />Bill Owens <br /> <br />r.^,~~nr <br /> <br />Greg Walcher <br />Executive <br />Director <br /> <br />Hal Simpson <br />State Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.