My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150086 Contract
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C150086 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2013 12:25:39 PM
Creation date
10/6/2006 12:26:35 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150086
Contractor Name
Glenwood Irrigation Company, The
Contract Type
Loan
Water District
40
County
Garfield
Bill Number
SPL
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />10, Captions. The captions and headings contained in this contract are for convenience and <br />reference only and shail not be construed so as to define or limit the terms or provisions <br />contracted herein, <br /> <br />11, CWCB's Approval. This contract requires review and approval of plans, specifications, <br />and various other technical and legal documents, The CWCB's review of these <br />documents is only for the purpose of verifying BORROWER'S compliance with this Contract <br />and shall not be construed or interpreted as a technical review or approval of the actual <br />design or construction of the PROJECT, Notwithstanding any consents or approvals given <br />to the BORROWER by the CWCB on any such documents, BORROWER shail be solely <br />responsible for the accuracy and completeness of such documents, <br /> <br />12, Waiver. The waiver of any breach of a term of this contract shail not be construed as a <br />waiver of any other term, or of any subsequent breach of the same term, <br /> <br />13. Addresses for mailing. Ail notices, correspondence, or other documents required by <br />this contract shall be delivered or mailed to the addresses shown in the Section 1 <br />(Borrower Information) of the Project Summary, for the BORROWER and to the address <br />below for the CWCB: <br /> <br />Colorado Water Conservation Board <br />Attn: Construction Fund Section <br />1313 Sherman Street, Room 721 <br />Denver, CO 80203 <br /> <br />14,Additional Contract Requirements. Any additional contract requirements are shown in <br />Additional Contract Requirement (Section 10) of the Project Summary, <br /> <br />SPECIAL PROVISIONS (6/97 version), State Fiscal Rule 3-1 requires the inclusion of these Special <br />Provisions in every STATE contract, including grants, <br /> <br />1. CONTROLLER'S APPROVAL. CRS 24-30-202 (1) <br /> <br />This contract shall not be deemed valid until it has been approved by the Controller of the State of <br />Colorado or such assistant as he may designate, <br /> <br />2. FUND AVAILABILITY. CRS 24-30-202 (5.5) <br /> <br />Financial obligations of the State of Colorado payable after the current fiscal year are contingent <br />upon funds for that pUlpose being appropriated, budgeted, and otherwise made available, <br /> <br />3. INDEMNIFICATION. <br /> <br />The Contractor shall indemnify, save, and hold harmless the State, its employees and agents, against <br />any and all claims, damages, liability and court awards including costs, expenses, and attorney <br />fees incurred as a result of any act or omission by the Contractor, or its employees, agents, <br />subcontractors, or assignees pursuant to the terms of this contract <br /> <br />4. INDEPENDENT CONTRACTOR. 4 CCR 801-2 <br /> <br />THE CONTRACTOR SHALL PERFORM ITS DUTIES HEREUNDER AS AN INDEPENDENT CONTRACTOR AND <br />NOT AS AN EMPLOYEE. NEITHER THE CONTRACTOR NOR ANY AGENT OR EMPLOYEE OF THE <br /> <br />Page 8 of 10 <br /> <br />Loan Contract <br />
The URL can be used to link to this page
Your browser does not support the video tag.