Laserfiche WebLink
<br />" <br /> <br />AGENCY NAME: Water Conservation Board <br /> <br />AGENCY NUMBER: PDA <br />ROUTING NUMBER: . ~ <br /> <br /> <br />i <br /> <br />, <br /> <br />Contract Amendment No.2 <br /> <br />This Amendment, made this 21st day of September 2001, by and between the <br />State of Colorado for the use and benefit of the Department of Natural Resources, <br />Colorado Water Conservation Board, hereinafter referred to as CWCB or STATE, and The <br />Consolidated Mutual Water Company, hereinafter referred to as Borrower and/or <br />CONTRACTOR. <br /> <br />Factual Recitals <br /> <br />A. Authority exists in the law, and funds have been budgeted, appropriated, and <br />otherwise made available and a sufficient unencumbered balance thereof remains <br />available for payment in Fund Number 424, Appropriation Code L99, Contract <br />Encumbrance Number C150011. <br /> <br />B. Required approval, clearance, and coordination have been accomplished from and <br />with a ro riate a en i <br /> <br />C. The CWCB and the CONTRACTOR entered into Contract Encumbrance Number <br />C150011, dated October 13, 1999, and amended May 1, 2000, hereinafter referred to <br />as ORIGINAL CONTRACT, incorporated herein by reference, wherein the CWCB agreed <br />to loan money in the total amount of $16,300,000, and the CONTRACTOR agreed to <br />repay the loan in accordance with the terms of the ORIGINAL CONTRACT. <br /> <br />D. Due to unforeseen site conditions, design modifications of the project, and changes <br />instituted by regulatory agencies, additional work was required that increased the <br />total estimated cost of the PROJECT. To meet the increased costs, the Contractor <br />requested an additional $4,333,000, for a total loan amount of $20,633,000, <br /> <br />E. S.B.99-173, Section 1(2) provides that the CWCB may increase authorized loan amounts <br />as may be justified by "reasons of ordinary fluctuations in construction costs as indicated by <br />the engineering cost indices applicable to the types of construction required for eqch project <br />or as may be justified by reason of changes in the plan for a project due to differing or <br />unforeseen site conditions, errors or omissions in the plans and specifications, changes <br />instituted by regulatory agencies, or changes in material quantities beyond contract limits." <br /> <br />F. At its July 23-24, 2001 meeting, the CWCS approved increasing this loan by <br />$4,333,000, for a total loan amount of up to $20,633,000, to finance up to 75% of the <br />total PROJECT cost. The terms for the $4,333,000 loan amount are an interest rate of <br />.5.5% per annum and a repayment period of 10 years. <br /> <br />G. The CWCB and the CONTRACTOR have agreed to amend this contract to increase the <br />amount of the loan by $4,333,000, for a total loan amount of up to $20,633,000, which <br />may be used to finance up to 75% of the total PROJECT cost. <br /> <br />The Consolidated Mutual Water Company <br /> <br />Page 1 of4 <br /> <br />Contract Amendment No.2 <br />