My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01584
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:44:25 AM
Creation date
10/6/2006 12:25:59 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153576
Contractor Name
URS Consultants
Water District
0
County
Mesa
Bill Number
Sb 89-85
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />, <br /> <br />. <br /> <br />. <br /> <br />, <br /> <br />Task 5: <br /> <br />Site Evaluation/Screening <br /> <br />Objective: <br /> <br />To perform a more detailed evaluation of the remaining sites and study areas in <br />order to select no more than three sites for final evaluation. <br /> <br />Responsibility: <br /> <br />All team members will contribute to this task. <br /> <br />Methodology: <br /> <br />I. Using the criteria established as a part of Tasks 3 and 4, evaluate the remaining <br />sites at a greater level of detail. This will be done using the matrix approach of <br />Task 4, supplemented with more extensive descriptions of each factor and site. <br /> <br />2, Visit each of the sites to confirm and supplement information gathered from <br />map and literature sources. <br /> <br />3, More detailed consideration of siting factors at this stage will include <br />investigation of: <br /> <br />a. Proximity to suitable habitat and previously identified populations of <br />endangered species. <br /> <br />b. More specific application of the site-related biological and engineering <br />criteria of Task 3. <br /> <br />c. A vailability of housing, schools, and other community services within a <br />reasonable distance. <br /> <br />d, Proximity, degree of difficulty, and cost of obtaining utility services, <br />particularly electric power. The study will also consider telephone, gas, <br />potable water and sewage. <br /> <br />e. Hatchery effluent treatment and disposal requirements. <br /> <br />f. Availability, ownership, and cost of required land for hatchery site. <br />(Land area and configuration requirements will be determined in Task <br />3.) Site accessibility, including all-weather access, will also be <br />considered. <br /> <br />g. Degree of difficulty and cost of construction, particularly as related to <br />soils and foundations, availability of suitable materials, and <br />transportation of equipment and materials to the site. <br /> <br />h. Operation and maintenance costs will consider pumping requirements; <br />heating requirements for facilities, the use of solar insolation, staffing, <br />and other cost items, primarily from the standpoint of differences <br />between sites. <br /> <br />1. Site geologic suitability will include consideration of landslide potential <br />at the sites and along the access road(s), foundations, and construction <br />materials. <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.