Laserfiche WebLink
<br />, <br />; <br /> <br />.-....- ., <br />. <br />L <br /> <br />! <br /> <br />AGENCY NAME: Water Conservation Board <br /> <br />AGENCY NUMBER: PDA <br /> <br />ROUTING NUMBER: <br /> <br /> <br />CON T RAe TAM END MEN T #1 <br /> <br /> <br />THIS AMENDMENT, made this I ~ day of [)f{'lm6f~_1995, by and between the <br />State of Colorado for the use and benefit of the Department of Natural Resources, Colorado Water <br />Conservation Board (CWCB), hereinafter referred to as the STATE, and CITY OF FORT LUPTON and the <br />FORT LUPTON WATER UTILITY ENTERPRISE, P. O. Box 148, Fort Lupton, Colorado 80621, hereinafter <br />referred to as the CONTRACTOR. <br /> <br />FACTUAL RECITALS <br /> <br />1. Authority exists in the law, and funds have been budgeted, appropriated, and otherwise <br />made available and a sufficient unencumbered balance thereof remains available for payment in Fund <br />Number 424, Appropriation Code 444, Contract Encumbrance Number C153664; and <br /> <br />2. Required approval, clearance, and coordination has been accomplished from and with <br />appropriate agencies; and <br /> <br />3. The STATE and the CONTRACTOR entered into a contract dated March 2, 1994, Contract <br />Routing Number 940371, Contract Encumbrance Number C153664, hereinafter referred to as ORIGINAL <br />CONTRACT, incorporated herein by reference, wherein the STATE agreed to loan money in the total <br />amount of $4,233,000, and the CONTRACTOR agreed to repay the loan in accordance with the terms of <br />the ORIGINAL CONTRACT; and <br /> <br />4. The Repayment Schedule, referred to as APPENDIX F in the ORIGINAL CONTRACT, incorrectly <br />referred to the loan amount as $4,223,000 and the repayment was calculated using this incorrect <br />amount instead of the correct amount of $4,233,000; and <br /> <br />5. The STATE and the CONTRACTOR have agreed, in accordance with Paragraph B.6 of the <br />ORIGINAL CONTRACT, that the interest accrued during construction shall be added to the principal loan <br />amount, and that the date of first payment for the loan will be January 1, 1997; and <br /> <br />6. The parties mutually agree to amend the ORIGINAL CONTRACT in order to establish a correct <br />annual repayment amount and correct loan amount on the Repayment Schedule; and <br /> <br />7. The STATE has deteremined that the collateral pledged in the ORIGINAL CONTRACT is adequate <br />to cover the loan amount increased by the accrued interest during construction added into the loan <br />amount to be repaid. <br /> <br />City of Fort Lupton & the Fort Lupton Water Utility Enterprise Contract Amendment <br /> <br />Page 1 of 3 <br />