My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01567
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01567
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:44:24 AM
Creation date
10/6/2006 12:25:45 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150010
Contractor Name
Columbine Ranches Property Owners Association
Contract Type
Loan
Water District
0
County
Adams
Bill Number
SB 99-173
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I~ :~-'l----- <br /> <br /> <br />.. <br />j 6. If for irrigation, approximate number of acres <br />, <br />I <br />benefitted: NIA <br />New land: NI A <br /> <br />. <br /> <br />. <br /> <br />8 <br /> <br />which would be <br /> <br />presently irrigated: NIA <br />(((DOMESTIC WATER SYSTEM))) <br /> <br />7. Estimated project cost, if known:UNKNOWN AT THIS TIME. <br />8. Has any other type of financing been explored? NO <br />If YES, through what agencies and with what results? <br /> <br />THE UTE WATER CONSERVANCY DISTRICT WILL <br />EXPLORE ALL OPTIONS <br /> <br />9. <br /> <br />Have any written reconnaissance or feasibility reports been <br />prepared for this project? YES - OCTOBER, 1987 <br />If YES, please submit a copy of such reports, if available. <br /> <br />Have any consultants been employed to investigate this project? <br />YES <br /> <br />If YES, please give name and address of such consultants: <br /> <br />10., <br /> <br />WESTERN ENGINEERS, INC. <br />A GRAND JUNCTION CONSULTING FIRM COMPLETED A TOTAL PROJECT <br />FEASIBILITY STUDY IN OCTOBER, 1987, AND A COpy OF THE 4- <br />VOLUME REPORT PLUS THE EXECUTIVE SUMMARY WAS SUBMITTED <br />FOR YOUR REVIEW SHORTLY THEREAFTER. <br /> <br />11. State the total cash expenditure already made or incurred, if any, <br />by the applicant in investigating the feasibility of the project: <br /> <br />~15~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.