My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01567
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01567
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:44:24 AM
Creation date
10/6/2006 12:25:45 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150010
Contractor Name
Columbine Ranches Property Owners Association
Contract Type
Loan
Water District
0
County
Adams
Bill Number
SB 99-173
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />12 <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br /> <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80~03 <br />Phone: (303) 866.3441 <br />fAX: (303) 866-4474 <br /> <br />STATE OF COLOMDO <br /> <br />- <br /> <br />, <br /> <br />MEMORANDUM <br /> <br />Roy Romer <br />Covernor <br /> <br />'llme$ S. Lochhead <br />fxecU!ive OirectClr, ONR <br /> <br />OariesC. LUe,P.E. <br />Director. eWeB <br /> <br />TO: <br /> <br />Peter Evans <br />Bill Stanton <br />Mike Serlet 6/ <br /> <br />BiU Green 1? <br /> <br />FROM: <br /> <br />DATE: <br /> <br />May 8, 1998 <br /> <br />RE: <br /> <br />Ute WeD I Feasibility Update Report <br /> <br />Attached is the Feasibility Update Report for the Plateau Creek Pipeline Replacement <br />Project of the Ute Water Conservancy District. The purpose of the report is to update the <br />feasibility work for the project before disbursing the remaining funds in the District's <br />19S5 Construction Fund authorization (about $6.4 million remains). The last feasibility <br />study for the project was completed in 1991 and a great deal has taken place since then as <br />summarized in the attached report. <br /> <br />The report served as the basis for our May Board meeting memo on the Plateau Creek <br />Project. Ris also intended to serve as documentation (with updates as necessary) for any <br />, additional funding request the District may wish to pursue later this year. The District <br />staff has indicated they would like to approach the Board this fall for an additional <br />Construction Fund loan for the project which has more than doubled in cost since it was <br />originally presented to the Board in 1987. <br />
The URL can be used to link to this page
Your browser does not support the video tag.