My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01567
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01567
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:44:24 AM
Creation date
10/6/2006 12:25:45 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150010
Contractor Name
Columbine Ranches Property Owners Association
Contract Type
Loan
Water District
0
County
Adams
Bill Number
SB 99-173
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />describe any existing operational or maintenance problems. Attach separate sheets if <br />needed, and a map of the service area. We have a shallow irrigation well. a line <br />running from the well to our storage tank. lines from the tank throughout the <br />neighborbood and a meter at the tank. <br /> <br />F or existing facilities indicate: <br />Number of shareholders nla <br /> <br />or Number of customers served 54 lots <br /> <br />Current Assessment per share $ Number of shares <br />An assessment per lot will be determined by the Board of CRPOA when the <br />purchase of water is made. <br />Number of acres irrigated <br />Part B. - Description of the Project <br />I. Name of the project or facility Columbine Ranches Augmentation Water Pur. <br />2. Purpose of this loan application. Check one. <br />New project <br />Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br />XX Other (describe) To purchase water to provide augmentation for our <br />well. The water will be used to satis(y an existing need for augmenting the existing <br />irrigation well. <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently <br />under a storage restriction order from the State Engineer? YES _ NO _n/a <br />4. General location of the project. (Please include county, and approximate distance and <br />direction from nearest town, as well as legal description, if known. <br />Our well is located in Adams County. It is in Section 5. Township 2 South. <br />Range 66 West. of the 6th P.M. SW1/4. NE 1/4. Section 5. Approximately seven <br />miles south of Brighton. <br />5. Please provide a brief narrative description of the proposed project including purpose, <br />need, facilities, type of water uses to be served and service area. Attach separate <br />sheet, if needed. We are negotiating the purchase ofsome Barr Lake shares and <br />some municipal water to be used to augment our irrigation well. The municipal <br />water is consumable affluent from the waste water treatment plant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.