Laserfiche WebLink
<br />AGENCY NAME: Water Conservation Board <br /> <br />AGENCY NUMBER: PDA <br />ROUTING NUMBER: <br /> <br />CONTRACT AMENDMENT No.3 <br /> <br />THIS AMENDMENT, made this 2f3!i day of ~ 2000, by and <br />between the State of Colorado for the use and bene of the Department of Natural <br />Resources, Colorado Water Conservation Board, hereinafter referred to as the CWCB and/or <br />STATE. and the Ute Water Conservancy District, hereinafter referred to as the DISTRICT, <br />and the Ute Water Activity Enterprise, P.O. Box 460, Grand Junction, CO 81502-0460, <br />hereinafter referred to as the BORROWER and/or CONTRACTOR. <br /> <br />FACTUAL RECITALS <br /> <br />A. Authority exists in the law, and funds have been budgeted, appropriated. and otherwise made <br />available and a sufficient unencumbered balance thereof remains available for payment in Fund <br />Number 424, Appropriation Code 419, Contract Encumbrance Number C153670B. <br /> <br />B. Required approval, clearance, and coordination have been accomplished from and with <br />appropriate agencies. <br />C. The STATE. the DISTRICT and the BORROWER entered into a contract dated March 31, 1995, <br />Contract Encumbrance Number C153670B, which was amended on July 10, 1996 and October <br />23, 1997, hereinafter referred to as ORIGINAL CONTRACT, which is incorporated herein by <br />reference, under which the STATE agreed to loan the BORROWER up to $7,537,500 at an interest rate <br />of 5% per annum for a term of thirty years to finance the design and construction of the DISTRICT'S <br />and BORROWER'S Plateau Creek Pipeline Project (hereinafter referred to as the PROJECT), and the <br />BORROWER agreed to repay the loan in accordance with the terms of the ORIGINAL CONTRACT. The <br />total cost of the PROJECT is estimated to be $55,360,000. <br /> <br />D. The DISTRICT and the BORROWER applied to the STATE for an additional loan of $9,600,000 to <br />finance PROJECT costs. The STATE has reviewed a feasibility study report on the PROJECT compiled <br />by Stefan, Robertson and Kirsten in 1991, a February 1998 environmental impact statement (EIS) <br />prepared for the PROJECT, and an update of the 1991 feasibility study report prepared by CWCB <br />staff and DISTRICT staff, all of which are incorporated herein by reference, and, based upon the <br />feasibility report as updated and upon the EIS, the STATE determined the PROJECT to be technically <br />and financially feasible. <br /> <br />E. At its November 1998 meeting, the CWCB approved an additional loan to the BORROWER in the <br />amount of up to $9,600,000 from the CWCB Construction Fund andlor the Severance Tax Trust <br />Fund Perpetual Base Account at an interest rate of 4.75% per annum for a term of thirty (30) years <br />to finance PROJECT costs. The CWCB conditioned the loan upon the BORROWER raising its water <br />rates prior to entering into the loan contract. On April 14, 1999, the BORROWER approved a motion <br />raising its water rates effective July 1, 1999. <br /> <br />F. Pursuant to 1999 Colo. Sess. Laws, Ch. 218, Section 3, the Colorado General Assembly authorized <br />the CWCB to loan to the DISTRICT, acting by and through the BORROWER, an additional $2,600,000 <br />from the Construction Fund, at an interest rate of 4.75% per annum for a term of thirty (30) years for <br />financing PROJECT costs. The General Assembly also authorized the CWCB to loan to the DISTRICT, <br />acting by and through the BORROWER, an additional $7,000,000 from the Severance Tax Trust Fund <br />Perpetual Base Account for the PROJECT, which loan will be made by a separate contract. <br /> <br />Page 1 of 8 <br />