My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153705 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C153705 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:33 AM
Creation date
10/6/2006 12:25:25 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153705
Contractor Name
Beaver Reservoir Company
Contract Type
Loan
Water District
59
County
Gunnison
Bill Number
SB 94-029
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I, <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I' <br />I. <br />I <br />I <br />I <br />, <br /> <br />I <br /> <br />~, <br /> <br />._~ <br /> <br />r' <br />-~, <br /> <br />Woodward..clyde <br />Consultants <br /> <br />Mr. Hal Simpson <br />Colorado State Engineer <br />October 26, 1992 <br />Page 4 <br /> <br />Following installation of the graded filter each sinkhole was backfilled with native <br />clayey soils. The backfill was spread in horizontal lifts not exceeding 12 inches loose <br />thickness. Each lift was compacted to at least 95 percent of the maximum standard <br />Proctor density with at least 6 passes of a 950 caterpillar loader or 6 passes of a BPF <br />480 Ingersoll-Rand compactor. Standard Proctor, sand cone density, and nuclear <br />, . <br />density test results are attached to this letter. The backfill materials were accepted for <br />use based on visual classification in the field and gradation and Atterberg limits test <br />results supplied by the contractor. All test results are attached. <br /> <br />Conclusions And Recommendations <br /> <br />Based on our observations, we believe thauh~ sinkhole capping work was completed <br />in substantial compliance with the t~chiiicals;~~ifications. We recommend that the <br />work be accepted as complete for the purpose of temporary repairs. <br /> <br />Limitations <br /> <br />Woodward-Clyde Consultants represents that our services are performed within the <br />limits prescri~~by.th~ client, in a manner consistent with the level of care and skill <br />ordinarily,exercis,e.d by otherprofessional consultants under similar circumstances. No <br />other representationcto client, expressed or implied, and no warranty or guarantee is <br />included or intended. <br />", <br /> <br />23067fLElI I().J()'92 (I:J8pRl)fRl'TfI <br />
The URL can be used to link to this page
Your browser does not support the video tag.