My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153705 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C153705 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:33 AM
Creation date
10/6/2006 12:25:25 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153705
Contractor Name
Beaver Reservoir Company
Contract Type
Loan
Water District
59
County
Gunnison
Bill Number
SB 94-029
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />September 3, 1993 <br /> <br />Colorado Water Conservation Board <br />1313 Sherman Street, Room 721 <br />Denver, Co 80203 <br /> <br />Attention: <br /> <br />Mr. Danes "Chuck" Lile <br />Director <br /> <br />Subject: <br /> <br />Feasibility Study for Rehabilitation of Beaver Reservoir <br />Project No. 23067 <br /> <br />Dear Mr. Lile: <br /> <br />Beaver Reservoir Company is hereby ttansmitting to the Colorado Water Conservation <br />Board (CWCB) the attached feasibility report. for the rehabilitation of Beaver <br />Reservoit. This feasibility report presents the study conducted as part of the Beaver <br />Reservoit Company's application to the' CWCB for financing the rehabilitation <br />construction cost. <br />'. <br /> <br />The attached report has been prep;U:eil 'accordJ.ng to the Guidelines for Assistance <br />through the Colorado Water ConservaiioncBoard Construction Fund. All the required <br />documents have been included in the report an<:fappendixes. <br /> <br />With the submittal of this report the Beaver Reservoir Company is formally requesting <br />from the Colorado WatercConservation Board Construction Fund to finance the project <br />cost for the rehabilitation of Beaver Reservoir. Thank you for your consideration of <br />this funding. We look fOlWard to yout approval. <br /> <br />Sincerely, <br /> <br />~~----- . <br /> <br />.~-- . <br /> <br />Neil Thompson <br />President <br /> <br />'c <br />JWF:art <br />(1 copy senti <br />Enclosure <br />Ic: File <br /> <br />23067/RI.LEl 09-03-93(3:4Opm)/RPT <br />
The URL can be used to link to this page
Your browser does not support the video tag.