Laserfiche WebLink
and specifications for the PRO�ecT. <br />B. The BORROWER and the Engineering ConsultanYs Agreements and the plans and <br />specifications must be submitted to the CWCB staff for verification of compliance with the <br />terms of this contract when available prior to bidding. Any modifications to the plans and <br />specifications must be approved in writing by the CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by § 37-87- <br />105 C.R.S., the BoRROwER shall provide a letter of approval from the State Engineer's Office <br />prior to construction. <br />D. CWCB staff must be present at bidding and must approve the award of the construction <br />contract. <br />E. The BoRROweR shall contract for the construction of the work with responsible and capable <br />Construction Firms, which said Construction Firms shall be selected by the BoRROweR and <br />found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract documents <br />consisting of the contractor's proposai, construction contract, perFormance bond, payment <br />bond, notice of award, notice to proceed, sample change order, and sample field order, as <br />well as the advertisement for bid and bid bond at bidding. After the CWCB staff verifies that <br />these documents comply with the terms of this contract, the BoRROweR may issue the notice <br />to proceed to the Construction Firms. <br />G. The BoRrtoweR shall conduct a pre-construction conference at which time the CWCB staff <br />shaA have the opportunity to review and approve the construction schedule. <br />H. If the CWCB staff determines that the PROJECT requires a resident inspector during <br />construction, the BoRROwER shall employ an inspector who has been approved by the CWCB <br />stafF. <br />I. The BoRROweR shall construct the PRO�ECT in accordance with the approved plans and <br />specifications. <br />J. Upon completion of the PRO�ECT construction, the BoRROweR shall provide as-built dra�tings <br />of the PRO�ecT to the CWCB staff, or, if required by § 37-87-105, C.R.S., the BoRROweR shall <br />provide the as-built drawings to the State Engineer's Office for approval and filing. <br />K. Upon completion of the PRO�ecT construction, the BoRROweR shail arrange a final inspection <br />forthe CWCB staff. <br />L. The BoRROweR shail pay all of the expenses related to the PRO�ecT when such bills are due. <br />SecrioN 7— Eucia�e ExPeNSes. The following items are eligible for loan disbursements. <br />A. P�eparing final designs and specifications for the PROdecT. <br />B. P�eparing bid and construction contract documents. <br />C. Pfeparing environmental assessment or environmental impact statements, and otherwise <br />complying with the Federal National Environmental Policy Act. <br />D. Complying with all federal, state, and local regulatory requirements, including the obtaining <br />all required permits. <br />E. Fish and wildlife mitigation measures required by federal, state, or local laws and regulations. <br />F. Actual construction as called for in the design documents and in change orders approved by <br />the CWCB and the BoRROweR. <br />