My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150087 Contract
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C150087 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2013 8:47:40 AM
Creation date
10/6/2006 12:25:21 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150087
Contractor Name
Cedar Mesa Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
SPL
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
was less invasive to the existing dam then the placement of a vertical cl�inuiey drain. The vertical <br />chimney design had some inherent risks associated with excavating a vertical trench into the <br />downstream slope of the existing dam. <br />The original cost estimate included an item for construction surveillance in the amount of <br />$7,912. This number did not include the prepazation of as-built drawings upon completion of the <br />project, which is a State Engineer requirement, and underestnnated the actual field time required to <br />complete the project <br />Added Cost (Change OrderDesign): $9,200 <br />Added Cost (Const. Surveillance/As-builts): $1 �,885 <br />Construction Site Access Difficu[ties <br />Due to the unlaiown condition of the access road to the reservoir at the time of conshuction, <br />the Cedaz Mesa Ditch and Reservoir Company could not obtain a quanrified bid to provide a <br />maintained access road to the construction site. The selected Contractor, however, did negotiate an <br />hourly rate for the necessary equipment and labor to keep the roadway assessable during the <br />duration of the pro}ect. The cost of maiutaining the access road during conshuction was based on <br />the total equipment and man-hours actually used. <br />Added Cost: $9,830 <br />The following is a summary of the actual cost incurred by the Cedar Mesa Ditch and <br />Reservoir Company and iYs Contractor: <br />Original Cost Actual Cost Variance <br />Estimate Incurred <br />Zak Dir� Inc. <br />* Embanlrnient Itehabilitation $92,085 $103,200 $11,115 <br />Cedar Mesa Ditch Co. <br />* Prior Peizometer Installa6on $8,920 $8,920 <br />* Prior Eng. and Soils Work $13,342 $13,342 <br />* Feasibility Study $9,720 $9,720 <br />* Final Design ECI <br />* C.O. Design/Insp. ECI <br />$0 <br />$7,915 <br />$28,000 <br />$35,000 <br />Totals: <br />$131,962 <br />$198,182 <br />$0 <br />$0 <br />$0 <br />$28,000 <br />$27,085 <br />$66,200 <br />Based on the addirional costs as illustrated above, the Cedaz Mesa Ditch and Reservoir <br />Company is requesting 75% of the total addirional project cost incurred, for an increased loan <br />amount rounded to $50,000. <br />DISCUSSION <br />Paragraph (2) of Section 1 of SB 00-173 allows that loans made by the Colorado Water <br />Conservation Board may be increased or decreased as may be justified by "reasons of ordinary <br />fluctuations in construction costs as indicated by the engineering cost indices applicable to the fypes <br />of construction required for each project or as may be justified by reason of changes in the plans for <br />a project due to differing or unforeseen site conditions, errors, or omissions in the plans and <br />spec�cations, changes instituted by regulatory agencies, or changes in material quantities beyond <br />
The URL can be used to link to this page
Your browser does not support the video tag.