Laserfiche WebLink
Below is a brief suminary of the major project elements and their estimated cost as <br />presented in the original cost estimate: <br />Mobilization <br />Excavate Access Bench <br />Excavate Chimney Drain <br />Supply/Place Chimney Gravel <br />Backfill Bench <br />SupplylInstall Chimney Outfall <br />Excavate Toe Drain <br />Supply/Place Perforated Toe Drain <br />5upplylPlace Toe Drain Gravel <br />Sub-total: <br />5% Contingency <br />Construction Total: <br />_ $5,000 <br />_ $7,500 <br />_ $7,000 <br />_ $41,400 <br />_ $7,500 <br />_ $5,000 <br />_ $1,300 <br />_ $6,000 <br />_ �7,000 <br />_ $87,700 <br />_ $4,385 <br />_ $92,085 <br />Engineering Quality Assurance = $7,915 <br />Frevious Piezometer Installation = $8,920 <br />Previous Eng. and Soils Work = $13,342 <br />Feasibility Study = $9.720 <br />Total Project Cost = $131,962 <br />The dam rehabilitation work was bid for construction in the summer of 2002, and was <br />awarded to Zak Dirt, I,ongmont, Colorado in September of 2002, at their bid price of $93,700. The <br />Contractor mobilized on-site in September of 2002 and completed the work in October of 2002. <br />During construction of the project the Cedaz Mesa Ditch and Reservoir Company <br />encountered cost overruns, due to design modifications, construction access difficuities, and <br />additional work added during the time of construction. Theses addirional costs aze summarized as <br />follows: <br />Professiona[ EngineerinQ Services: <br />Pr�* t^ Lhe dev .°.�CY:::C�t Cf fii .a: design gls:.� f:,, t�he p�ject, the �edar hiesa i�itcn and <br />Reservoir Company hired the services of Smith Geotechnical, Fort Collins, Colorado to perform <br />preliminary engineering and soils investigation to rehabilitate the dam. This preliminary work was <br />conducted a number of years ago, with a significant portion of the prior soils work deemed unusable <br />by the State Engineer's Office. The State Engineer's concem on the soils investigation was the time <br />frame that had transpued from the point of collection to the time that the material testing actually <br />took place. Therefore, given the status of the preliminary engineering work, the Cedar Mesa Ditch <br />and Reservoir Company hired the services of Knight Peisold, Denver, Colorado to utilized the <br />information available and to prepaze final design plans to rehabilitate ihe existing reservoir to the <br />guidelines of the State Engineer's Office. <br />Added Cost: $28, D00 <br />. <br />. <br />• <br />The final design submitted to the State Engineer's Office for review included the placement <br />of a vertical chimney drain in the existing dam embanlmient. Based on the recommendation from <br />the State Engineer's Office during their review process this design alternative was changed to <br />include a buttress fili, 15-feet wide at a maximum height of 20-feet, placed at the downstream toe of <br />