My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153604 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C153604 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2009 9:26:17 AM
Creation date
10/6/2006 12:25:14 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153604
Contractor Name
Julesburg Irrigation District
Contract Type
Loan
Water District
64
County
Logan
Bill Number
SB 86-27
Loan Projects - Doc Type
Feasibility Study
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />CHAPTER IX <br />CONCLUSIONS AND RECOMMENDATIONS <br /> <br />. <br /> <br />The Julesburg Irrigation District is a Statutory Irrigation District which owns and operates <br />Julesburg Reservoir, Currently the outlet works conduit and adjacent embankment fill exhibit <br />serious seepage and structural problems. The reservoir Is currently operating under a storage <br />restriction imposed by the State Engineer because of these problems. <br /> <br />. <br /> <br />Several alternative rehabilitation measures have been proposed for the outlet works and <br />adjacent embankment, ranging in scope from a minimum repair alternative for control of the <br />problems to a complete replacement alternative for elimination of the problems. <br /> <br />. <br /> <br />Based on the overall costs of replacement versus repair and on the higher level of <br />confidence in the quality, durability and life expectancy of the replacement alternatives versus the <br />repair alternatives, we recommend that the full outlet works replacement, Alternative F, be selected <br />as the rehabilitation option, This alternative is economically feasible as demonstrated by the <br />financial analysis presented in Table 16. We believe the Alternative F outlet works replacement will <br />provide a cost effective, long-term solution to the problem, <br /> <br />. <br /> <br />. <br /> <br />'c}c t-IV;l.f7 <br />/' A(V~::;"~h <br />It is recommended that the District borrow $325,000 for ~ term at an interest rate <br />of 5,0 percent per year from the CWCB Construction Loan Fund for the purpose of reconstructing <br />the outlet works on Julesburg Reservoir. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />23 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.