Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Mr, Larry Frame, Superintendent <br />Julesburg Irrigation District <br />November 27, 2000 <br /> <br />Page 2 <br /> <br />c) You must adhere to the CWCB Desiqn i3nd Construction Administration Procedures. Tim <br />Feehan will contacted you regarding the CWCB requirements concerning project bidding, <br />design, and construction, Tim will make cor1struction inspections, which will be the basis of the <br />monthly pay estimates for disbursement of your loan funds, <br /> <br />d) You must adhere to the CWCB Guidelines for Financial Assistance, A copy of our Guidelines <br />has been provided to you previously, <br /> <br />On behalf of the Board, I would like to thank yOU for applying for a Small Project Loan from the <br />Colorado Water Conservation Board, . <br /> <br />~~ <br /> <br />Mike Serlet, PE, Chief <br />Water Supply Planning and Finance Section <br />C(llorado Water Conservation Board <br /> <br />Attachments: <br /> <br />1. Updated Memo: JuJesburglo-petersonl100l"[lemo <br /> <br />cc (w/Attachment 1,): <br /> <br />Mr. Eric Wilkinson, Board Member, Colorado Water Conservation Board <br />Glenn Newlon, NRCS Area Engineer, 2343 27th St., Suite 506, Greeley, CO 80634-8044 <br />, CWCB Section B Staff / <br />\ Linda Bassi, AGO <br />Chrono File <br /> <br />c: wp51\Proj.New\JulesburgID-Peterson 11001t( <br />