My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150143 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C150143 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 9:52:33 AM
Creation date
10/6/2006 12:24:19 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150143
Contractor Name
Willow Heights Irrigation Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
MC3
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />; <br /> <br />WUlow Heights ln1gallon Company, Inc. <br />May 19-20, 2003 <br /> <br />Agenda Item 1&1 <br /> <br />Water Project Construction Loan Program.ProJect Data <br /> <br />Borrower: <br /> <br />wmow Heights Irrigation Co. <br /> <br />County: Delta <br /> <br />Project Name: Dual Water System <br /> <br />Project Type: Rehabilitation/Replacement <br /> <br />Drainage Basin: Gunnison <br /> <br />Water Source: Leroux Creek <br /> <br />Tolal Project Cosl: $115,000 <br /> <br />Funding Sources: CWCS <br />Aver, Delivery: 257 acre-feet <br /> <br />Type of Borrower: Municipal - Low Income <br /> <br />ewes Small Project Loan: $103,500 <br /> <br />Interest Rate: 3.75% Term: 30 years <br /> <br />WHIC owns and operates an existing piped irrigatJon system located in the Willow Heights <br />Subdivision and Duke Hili community in the Town of Hotchkiss. The system was constructed in <br />1976, and water is obtained through the Duke Ditch, which diverts water from Leroux Creek. Water <br />is supplied to about 95 residential lots and a Town park. The total irrigated area is about 60 acres, <br />and primarily use Is to irrigate lawns and gardens. The system consists of a headgate, <br />approximately 6000 lineal feel of main distribution piping (10", 8" and 6"), and approximately 3000 <br />feet of lateral piping. Water flows by gravity and Jots are served by~. Individual taps. The system <br />was Installed in the trench above the sanitary sewer and on the same grade. In places it is very <br />deep, up to 15-17 feet. The original piping was a lightweight plastJc pipe, and improper backfilling <br />resulted In crushed pipes in some areas, and significant plugging problems. As a result of the <br />blockages, and reduced flow due to mineral deposits, the overall flow capacity is less than 1/3 of <br />the original. The system Is completely obstructed in .two places, and typically only 12 to 14 users <br />can be served at a time. The project includes Installing all new dIstribution lines and lateral tap <br />lines, along with cleanouts and IsolatJon valves. The new pipes will be installed over the top of the <br />existing system but at a standard depth of 22 - 30". The piping will be heavier PVC, located above <br />the existing pipe, but offset several feet to eUminate sewer manhole conflicts. <br /> <br /> <br />Location Map <br /> <br />Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.