My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150143 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C150143 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 9:52:33 AM
Creation date
10/6/2006 12:24:19 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150143
Contractor Name
Willow Heights Irrigation Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
MC3
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />('\",ell Construction Fund Loan Arllllication <br /> <br />If YES. please explam. <br /> <br />7. Please list the names and addresses of the App]icants' engineer(s) and attomcy(s). <br /> <br />I\AME: <br /> <br />ADDRESS and PHONE <br /> <br />(;rcg S. Sl~lJm;1\ AU\'. <br /> <br />102 W. Bridge Sf. HOlchkiss. CO 8]419 872.3118 <br /> <br />Leroy Black, lHE Eneim'crine 4..t3Uod!!c 51. Delta CO 81416 970874-759] <br /> <br />8. List any feasibility studies or other investigations that have been completed or are 110\.... m <br />progn:ss for the proposed project. Please submit one copy of each completed study with this <br />application. 1\OI1C <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs. and estimated <br />conslruction costs. if known. <br /> <br />Estimated Engineering Costs: S 5.000 <br /> <br />Estimated Construction Costs: S I/O,OOO <br /> <br />Estimated Toral Costs: $ 115.000 <br />]0. Loan amount and lenns you are requesting. <br /> <br />Requested Loan Amount: <br />T elm (length) of]oan: <br />fnlcrcst Rate: <br /> <br />S 104,0011 <br />JOnars <br />3.75% <br /> <br />I';lrt C. - l'roject Sponsol' Fin:lIleiallnformation <br />Because the e\VCB Construction Fund is a revolving fund. it is importanl that the project <br />sponsor have the financial capacity to repay any loans made by the (\YeB. The following <br />inlormation is needed to assist the CW(B in a preliminary assessment of the applicant's financial <br />capacity. It is also requested lhat the project sponsor submit with this application copies of the <br />t\\O most recent annual repoI1~. financial slatt.'mcnts. corporate reports or other current <br />documentation of tinancial condition and operations. <br /> <br />1. List allY existing ]iability or indebtedness that exceeds one thousand dollars. For example. <br />banI.: loans, go\"ernment agency loans, bond issu.:s. accounts payable, etc. Include names and <br />addresses of lenders. amounts, due dales and maturity dates. Attach a separate schedule. if <br />net"ded. <br /> <br />o <br /> <br />CFLA9l)2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.