My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01511
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01511
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2010 12:39:20 PM
Creation date
10/6/2006 12:24:06 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153380
Contractor Name
Ute Water Conservancy District
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 81-439
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />fu(m 6-AC.OZA <br /> <br />DI::f :MENT OR AGE CY NUMBER <br />_1-04-0 <br />CONTRA.CT ROUTING NUMBER <br />00 <br />$7,500,000 <br /> <br />CONTRACT <br /> <br />THIS CONTRACT, made this 1 ~-th day of _~pril 1982, by and between the <br />Slate of Culurado ror Ihe use and benefit ur Ihe Department ur" Ni"lt:ural Resources <br />(~olorado Water ~onservation Boarrl\. <br />hereinafter refened to ISlhe Stale, and '2 -the IJtf'! Wrtf:p.r Con!';ervancy oi !=itri ~t. <br />P. O. Box 460. Granrl ,Junction. Colorado 8l~Ol. <br />hereinarter referred 10 as th~ 'c~ntractur I <br /> <br />WHEREAS, authority exists in the Law and Funds have been budgeted. appropriated and otherwise made <br />available and a suffacient ~ntncumbered balance thereof remains available for payment in Fund Number 4 008 , <br />G/L Account Number 5311X I Contract Encumbrance Numbe,('~/-~ ::J~ and <br />ABL Account Number 13112, Org. Unit 77-77-777, <br />WHEREAS. required approval. cleannce and coordination has been accomplished from and with appropriate <br />.agencies; and <br /> <br />WHEREAS, pursuant to the provisions of section 37-60-119, <br />Colorado Revised Statutes 1973, as amended, the State is <br />authorized to construct certain water projects for the benefit of <br />the people of the State; and <br /> <br />WHEREAS, the Contractor is a Water Conservancy District in <br />the State of Colorado and wishes to undertake the second phase of <br />construction to improve its present water supply system, herein- <br />after called the project, for the members of the Ute Water <br />Conservancy District in Mesa County, Colorado, at an estimated <br />cost of Seven Million Five Hundred Thousand Dollars ($7,500,000); <br />and <br /> <br />WHEREAS, a feasibility investigation of said project was <br />conducted and it was found that such a pro;ect is economically <br />feasible; and <br /> <br />WHEREAS, the State has agreed to construct said project and <br />to sell the same to the Contractor upon mutually agreeable terms <br />and conditions, subject to the availability of funding for that <br />purpose; and <br /> <br />WHEREAS, pursuant to Senate Bill No. 439, Fifty-Third <br />General Assembly of the State of Colorado, duly enacted into law, <br />thl'! Colorado {"later Conservation Board has been authorized to <br />expend a sum not to exceed Seven Million Five Hundred Thousand <br />Dollars ($7,500,000) for construction of the project; <br /> <br />NOW THEREFORE, in consideration of the mutual and dependent <br />covenants herein contained, it is agreed by the parties hereto as <br />follows: <br /> <br />A. The Contractor agrees that it shall: <br /> <br />1. Employ an engineering firm to prepare project plans and <br />specifications for the proposed project. Both the engineering <br />firm and the project plans and specifications shall be approved <br />by the State. <br /> <br />2. Subcontract the construction of said project to a <br />responsible and capable firm, said project to be completed within <br />two (2) years of the date of this contract in accordance with the <br />project plans and specificationc and any necescary rrDdific~ticn <br />thereof approved by the State. The State must approve, in <br />writing, all subcontracts before they become effect ive. 'l'he <br />above-mentioned time may be extended by the State if such time is <br />insufficient because of acts of God or other acts or circum- <br />stances beyond the control of the Contractor. <br /> <br />J95.53.Q1.c010 <br /> <br />Page I of -1L pages <br />-(See inslnu:liuns un rcvc,w ullasl page.) <br /> <br />dl01 <br />utE: (wed) 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.