Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />8. <br /> <br />9. <br /> <br />10. <br /> <br />~1::l45B <br /> <br />6. <br /> <br />\ViII the acquisition of additional water rights be necess3rJ'? Yes. See the <br />water rights application attached as Exhibit E. and the discussion under Project <br />.Yicl.d in Part 135 above. <br /> <br />7. <br /> <br />Please list the names and addresses of any technical or legal consultants <br />retained to represent the application or to conduct inn~stigations for the <br />proposed project: <br /> <br />Thomas A. \Villiamscn <br />Ilelton & Williamsen. P.C. <br />384 Inverness Drive South. Suite 1 J 5 <br />Englewood. CO 80112 <br />303-792-2161 <br /> <br />Gary n. Thompson <br />W.\V. \Vheeler & Associates. Inc. <br />3700 South Inca Street <br />Englewood. CO 80 II 0 <br />303-761-4130 <br /> <br />Glenn E. Porzak <br />Holme Robens & Owen <br />1401 Pearl Street. Suite 400 <br />Boulder. CO 80302 <br />303-444-5955 <br /> <br />List any feasibility studies or other investigations which have been completed <br />or arc now ill progress for the proposed project. The water rights yield analysis <br />prepared by Helton & \Villiamsen is attachcd as Exhibit J. <br /> <br />\Vhat is the estimated cost of the project? TI1C purchase will be phased m'er a ..j. <br />to 5 year period as firm project yield. is de\'cloped in Eagle Park Rcservoir. <br />"---:-Y--;0>lt"f/. -:-"; &(/ . <br />T~stimatcd total acquisition CO;1 for phase one of the Eagle Park Reservoir <br />Project is S 12.500.000. // .;/ ~ <br />/.Jt:. I. r ' <br /> <br />\Vhat loan amount and terms are YOIl requesting? <br /> <br />Requested loan amounl: <br /> <br />S 12.500.000 to be advanced in stages O\'er a ..j. ycar <br />period as project firm yicld is developed, <br /> <br />7 <br />