Laserfiche WebLink
<br />, , <br /> <br />. <br /> <br />. <br /> <br />'. <br /> <br />provide the as-built drawings to the State Engineer's Office for approval and filing. <br /> <br />k. Upon completion of the PROJECT construction, the BORROWER shall arrange a final inspection <br />for the CWCB staff. <br /> <br />I. The BORROWER shall pay all of the expenses related to the PROJECT when such bills are due. <br /> <br />2. Eligible Expenses. Listed below are the PROJECT expenses eligible for reimbursement: <br /> <br />a. Preparing final designs and specifications for the PROJECT. <br /> <br />b. Preparing bid and construction contract documents. <br /> <br />c. Preparing environmental assessment or environmental impact statements, and otherwise <br />complying with the Federal National Environmental Policy Act. <br /> <br />d. Complying with all federal, state, and local regulatory requirements, including the obtaining of <br />all required permits, <br /> <br />e. Fish and wildlife mitigation measures required by federal, state. or local iaws and regulations. <br /> <br />f. Actual construction as called for in the design documents and in change orders approved by <br />the CWCB and the BORROWER. <br /> <br />g. Engineering services for construction management, including design and construction <br />management for CWCB-approved change orders. <br /> <br />h. Interest during completion of the PROJECT pursuant to Paragraph A.2 herein, <br /> <br />i. Legal services for reviewing engineering services contracts, reviewing this contract, reviewing <br />construction contract documents, and for complying with all federal, state, and local <br />regulatory requirements. <br /> <br />3, Time for Performance. The BORROWER recognizes that time is of the essence in the <br />performance of all of its obligations under this contract. Therefore, the BORROWER shall complete <br />the PROJECT within the time specified in Section 6 (Time For Performance) of the Project <br />Summary. <br /> <br />4. Indemnification By The Construction Firm. The BORROWER shall require all Construction <br />Firms and their subcontractors to indemnify the CWCB and the BORROWER against all liability and <br />loss, and against all claims and actions based upon or arising out of damage or injury, including <br />death, to persons or property, caused by any acts or omissions of those parties or sustained in <br />connection with the performance of any contract related to the PROJECT or by conditions created <br />thereby, or based upon any violation of any statute, ordinance, or regulation, and the defense of <br />any such claims or actions. <br /> <br />5. Liability Insurance During Construction. During construction of the PROJECT, the BORROWER <br />shall require the construction firm(s) and any subcontractors to maintain the following insurance <br />coverage in the limits shown with a company that is satisfactory to the eWCB during the term of <br />their contracts for the construction of the PROJECT. Said general liability insurance shall name the <br />BORROWER and the CWCB as additional insured. An additional insured endorsement and a copy <br />of a current certificate of said liability insurance must be provided to the CWCB prior to <br />commencement of construction and maintained until construction is complete, No payments shall <br />be made to the BORROWER unless all insurance certificates are current. The BORROWER shall file <br />notices of renewals of said policies with the CWCB as renewals occur. Before or during the time <br />of construction, the CWCB reserves the right to increase the above limits of insurance as may be <br />warranted by the size of the PROJECT. <br /> <br />Page 7 of 12 <br />